<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Development Archives - Glen Gower | Councillor / Conseiller | Stittsville</title>
	<atom:link href="https://glengower.ca/category/development/feed/" rel="self" type="application/rss+xml" />
	<link>https://glengower.ca/category/development/</link>
	<description>Official web page for Glen Gower, councillor for Stittsville Ward in the CIty of Ottawa</description>
	<lastBuildDate>Fri, 13 Nov 2026 19:02:18 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://glengower.ca/wp-content/uploads/2025/04/favicon-2025-150x150.png</url>
	<title>Development Archives - Glen Gower | Councillor / Conseiller | Stittsville</title>
	<link>https://glengower.ca/category/development/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>What’s the latest on Stittsville residential development files? (November 2026)</title>
		<link>https://glengower.ca/development/whats-the-latest-on-stittsville-residential-development-files-november-2026/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=whats-the-latest-on-stittsville-residential-development-files-november-2026</link>
		
		<dc:creator><![CDATA[Team Stittsville]]></dc:creator>
		<pubDate>Thu, 12 Nov 2026 14:54:55 +0000</pubDate>
				<category><![CDATA[Development]]></category>
		<category><![CDATA[construction]]></category>
		<category><![CDATA[development]]></category>
		<category><![CDATA[development update]]></category>
		<category><![CDATA[Planning and Housing Committee]]></category>
		<guid isPermaLink="false">https://glengower.ca/?p=23365</guid>

					<description><![CDATA[<p>La version française suit There are over 30 residential projects in Stittsville that are in various stages of the approval and pre-construction process. Here’s the latest information that we have as of early November 2026. Hazeldean corridor  560 Hazeldean Road (Regional Group / EQ Homes) The applicant is proposing to rezone the site from “Agricultural, Rural [&#8230;]</p>
<p>The post <a href="https://glengower.ca/development/whats-the-latest-on-stittsville-residential-development-files-november-2026/">What’s the latest on Stittsville residential development files? (November 2026)</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><em>La version française suit</em></p>
<p>There are over 30 residential projects in Stittsville that are in various stages of the approval and pre-construction process. Here’s the latest information that we have as of early November 2026.</p>
<h3>Hazeldean corridor</h3>
<p><strong> </strong><a href="https://glengower.ca/tag/560-hazeldean/"><strong>560 Hazeldean Road</strong></a> (Regional Group / EQ Homes)</p>
<ul>
<li>The applicant is proposing to rezone the site from “Agricultural, Rural Exception 263” to permit future residential and non-residential land uses as well as an open space area next to the Carp River.</li>
<li>The proposal includes the development of 98 homes, including 50 detached homes and 48 townhouses, as well as a residential/mixed-use development block along Hazeldean Road.</li>
<li>In October 2025, the City received a <a href="https://glengower.ca/development/560-hazeldean-zoning-by-law-amendment-and-plan-of-subdivision-application/">Zoning By-law Amendment application</a> and Plan of Subdivision application, which are currently being reviewed.</li>
<li>This application was approved by the Planning &amp; Housing Committee at their meeting on Wednesday, October 7, 2026.</li>
</ul>
<p><strong> </strong><a href="https://glengower.ca/tag/5872-hazeldean/"><strong>5872, 5880, 5884 Hazeldean Road, and 7 Savage Drive</strong></a> (Hazeldean Heights Inc.)</p>
<ul>
<li>The City received a resubmission of this application in summer 2026</li>
<li>The applicant is now proposing three apartment buildings with heights of 27 storeys, 15 storeys, and 4 storeys.</li>
<li>The resubmission is currently being reviewed by City staff.</li>
</ul>
<p><a href="https://glengower.ca/tag/6310-hazeldean/"><strong>6310 Hazeldean</strong></a> (Scalia)</p>
<ul>
<li>The applicant is proposing a residential development containing 457 apartments, with heights stepping up from three storeys to 21 storeys.</li>
<li>City Council <a href="https://glengower.ca/development/new-info-and-next-steps-for-6310-hazeldean-road/">approved the Zoning By-law Amendment application</a> on September 18, 2024.</li>
<li>In <a href="https://glengower.ca/development/6310-and-6320-hazeldean-road-minor-zoning-by-law-amendment-and-site-plan-control/">November 2025</a> a Site Plan Control application was submitted, as well as a Minor Zoning By-law Amendment application. These applications have not been approved.</li>
</ul>
<p><a href="https://glengower.ca/tag/1174-carp-road/"><strong>1174 Carp</strong></a> (Groupe Maurice)</p>
<ul>
<li>The applicant is proposing to build a retirement home containing 413 apartments, with a building height ranging from 5 to 14 storeys. The proposed development includes a mix of underground and surface parking, as well as a new public park.</li>
<li>City Council <a href="https://glengower.ca/development/update-zoning-for-1174-carp-at-committee-on-september-3-2025/">approved the Zoning By-law Amendment application</a> on September 10, 2025.</li>
<li>They will need to submit a Site Plan Control application to the City.</li>
</ul>
<p><a href="https://glengower.ca/development/site-plan-control-application-for-1145-carp-road-at-hazeldean/"><strong>1145 Carp </strong></a>(Deschenes Poitras Realty Corp)</p>
<ul>
<li>The applicant is proposing to build a four-storey, 34-unit low-rise apartment</li>
<li>A Site Plan Control application has been approved.</li>
<li><a href="https://pub-ottawa.escribemeetings.com/Meeting.aspx?Id=cfe3449f-1396-4d3b-8d52-21cd8394d267&amp;Agenda=Agenda&amp;lang=English&amp;Item=12&amp;Tab=attachments">An application to the Committee of Adjustment</a> to subdivide their property into two separate lots was approved on April 15, 2025. The existing dental office building will remain on one lot and the proposed apartment building will be developed on the other lot.</li>
<li>There is no timeline available for construction.</li>
</ul>
<p><a href="https://glengower.ca/tag/6171-hazeldean/"><strong>6171 Hazeldean </strong></a>(Latitude Homes)</p>
<ul>
<li>City Council <a href="https://glengower.ca/development/update-6171-hazeldean-road-at-planning-and-housing-committee-on-april-10/">approved the Zoning By-law Amendment applicatio</a>n on April 17, 2024.</li>
<li>The development includes a mixed-use subdivision with 570 homes in total, including detached homes, townhouses, a nine-storey mixed use building, and low-rise apartments. The subdivision also includes a large community park, stormwater management pond, and various pathways.</li>
<li>Construction has started. Blasting operations began in <a href="https://glengower.ca/information/blasting-operations-in-the-stittsville-area/">May 2026</a> and is expected to last three to four months.</li>
<li>We are anticipating additional minor zoning bylaw amendments to facilitate the low-rise units early in the next term of Council.</li>
</ul>
<p><a href="https://glengower.ca/tag/stittsville-north/"><strong>North Stittsville future neighbourhood</strong></a></p>
<ul>
<li>The City, in collaboration with landowners of properties identified as “W2 North Stittsville – Future Neighbourhood,” are undertaking a planning and engineering study to provide for the development of this new neighbourhood.</li>
<li>This study will inform an Official Plan amendment to allow for this new development as part of an integrated planning, urban design and infrastructure engineering process.</li>
<li>A second open house was held in <a href="https://glengower.ca/development/recap-stittsville-north-w2-future-neighbourhood-open-house-2/">May 2026</a> and provided residents with an overview of the area’s existing conditions, development opportunities and constraints, and presented three draft concept plan alternatives.</li>
</ul>
<h3>Stittsville Main &amp; central area</h3>
<p><a href="https://glengower.ca/tag/37-wildpine/"><strong>37 Wildpine</strong></a> (Latitude Homes)</p>
<ul>
<li>The proposal is for a four-storey apartment building with 94 apartments, and a semi-detached home. The development would front onto a new road that would connect Wildpine Court and Ravenscroft Court.</li>
<li>City Council approved the <a href="https://glengower.ca/development/update-37-wildpine-at-planning-and-housing-committee-on-january-15-2025/">Zoning By-law application</a> on January 22, 2025.</li>
<li>A <a href="https://glengower.ca/development/construction-info-for-37-wildpine-court/">tree permit</a> has been issued to remove the trees that have been approved for removal. Fencing has been installed to delineate the removal area. This work began in late November 2025.</li>
<li>A <a href="https://glengower.ca/development/37-wildpine-court-site-plan-control-application/">Site Plan Control application</a> was submitted in April 2026 and is currently under review.</li>
</ul>
<p><a href="https://glengower.ca/tag/121-brae/"><strong>121 Brae </strong></a>(Taion Investments)</p>
<ul>
<li>City Council <a href="https://glengower.ca/development/update-121-brae-crescent-at-planning-and-housing-committee-on-december-4-2024/">approved the Zoning By-law Amendment application</a> on December 11, 2024.</li>
<li>The project is for a three-storey apartment building with five apartments at the corner of Brae and Norway Spruce.</li>
<li>There is no timeline available for construction.</li>
</ul>
<p><a href="https://glengower.ca/development/1835-stittsville-main-street-zoning-by-law-amendment/"><strong>1835 Stittsville Main</strong></a> (Jennifer Miller)</p>
<ul>
<li>The City received a zoning by-law amendment application for this site in 2022 which would allow for two additional detached homes. The amendment was conditionally approved by City Council due to servicing issues.</li>
<li>Those servicing issues have now been resolved, however we understand that the owner is intending to demolish the existing home to allow for additional low-rise multi-unit buildings, which is permitted in the zoning for the site.</li>
<li>No formal application has yet been made for the additional low-rise multi-unit buildings, and there is no timeline available for construction.</li>
</ul>
<h3>North area</h3>
<p><a href="https://glengower.ca/development/425-culdaff-road-zoning-variance-at-committee-of-adjustment-january-14/"><strong>425 Culdaff Road</strong></a> (Broadstreet / Seymour Pacific)</p>
<ul>
<li>A <a href="https://glengower.ca/development/425-culdaff-road-site-plan-control-application/">Site Plan Control application</a> has been approved.</li>
<li>The applicant is proposing to build a six-storey, U-shaped apartment building with 177 apartments, including a mix of studio, one-bedroom, two-bedroom, and three-bedroom units. A total of 212 parking spaces is provided.</li>
</ul>
<p><a href="https://glengower.ca/tag/1919-maple-grove/"><strong>1919 Maple Grove </strong></a>(Formasian Development Corporation)</p>
<ul>
<li>City Council approved the <a href="https://glengower.ca/development/update-1919-maple-grove-road-at-planning-and-housing-committee-on-december-4-2024/">Zoning By-law Amendment application</a> on December 11, 2024.</li>
<li>The applicant is proposing to build 36 semi-detached homes, 26 back-to-back townhomes, a park, and two blocks reserved for low-rise four-storey apartments estimated at 460 units. (The apartments will not be built until after the completion of the Stittsville Main Street extension that is abutting the property.)</li>
<li>The draft plan of subdivision has also been approved.</li>
<li>There is no timeline available for construction.</li>
</ul>
<p><a href="https://glengower.ca/tag/1927-maple-grove/"><strong>1927 Maple Grove</strong></a><strong> </strong>(Landric)</p>
<ul>
<li>City Council approved this <a href="https://glengower.ca/development/update-1927-maple-grove-road-at-planning-and-housing-committee-on-may-22/">Zoning By-Law Amendment application</a> on May 29, 2024.</li>
<li>A Plan of Subdivision application was draft approved in 2023 to subdivide the property into six townhouse blocks containing between six and seven units per block, for a total of 38 homes. All proposed homes will front onto a future public street, which will connect Maple Grove Road to a future subdivision north of the property.</li>
<li>There is no timeline available for construction.</li>
</ul>
<p><strong><a href="https://glengower.ca/tag/1869-maple-grove/">1869 Maple Grove Road</a></strong> (Landric Homes)</p>
<ul>
<li>The developer is finalizing all approvals and construction activities are anticipated to begin soon.</li>
</ul>
<p><a href="https://glengower.ca/tag/1981-maple-grove/"><strong>1981 Maple Grove</strong></a><strong> </strong>(Claridge)</p>
<ul>
<li>On April 18, 2023, <a href="https://glengower.ca/development/update-ontario-land-tribunal-decision-for-1981-maple-grove/">the Ontario Land Tribunal (OLT) ordered the approval</a> of the Draft Plan of Subdivision and Zoning By-law Amendment applications. They have 3 years from the draft approval date to register the subdivision agreement.</li>
<li>With the OLT approval, the Zoning By-law has been changed to permit the development of 212 homes, including single-detached, townhouses and back-to-back townhouses. There will also be a public park. The subdivision was also draft approved subject to conditions.</li>
<li>A detailed design still needs to be completed. The first detailed design submission was received in early 2024. Staff provided comments and are awaiting a resubmission.</li>
<li>They will also be responsible for connecting Maple Grove Road to Stittsville Main Street in Jackson Trails.</li>
<li>There is no timeline available for construction.</li>
</ul>
<p><a href="https://glengower.ca/development/2765-palladium-site-plan-control-application/"><strong>2765 Palladium</strong></a> (Broadstreet)</p>
<ul>
<li>The applicant is proposing to build three new six-storey apartment buildings, with 304 units and 320 parking spaces.</li>
<li>This would be the second phase of the &#8220;Palladium Terrace&#8221; development. The first phase is the development next door at 425 Culdaff Road (see above).</li>
<li>No zoning bylaw amendments or zoning bylaw amendments are required for the development to proceed.</li>
<li>Planning staff are currently reviewing the Site Plan Control application.</li>
</ul>
<p><a href="https://glengower.ca/development/815-roger-griffiths-avenue-site-plan-control-application/"><strong>815 Roger Griffiths</strong></a> (Richcraft)</p>
<ul>
<li>The applicant is proposing to build two 3-storey apartment buildings with 52 apartments and six blocks of stacked townhomes with 63 homes.</li>
<li>A <a href="https://glengower.ca/development/815-roger-griffiths-avenue-site-plan-control-application/">Site Plan Control application</a> was approved in May 2026. There is no timeline for construction.</li>
</ul>
<p><a href="https://glengower.ca/tag/21-huntmar/"><strong>21 Huntmar </strong></a>(North American Group)</p>
<ul>
<li>The applicant is proposing to build two, 6-storey apartment buildings with 349 residential apartments and 513 parking spaces.</li>
<li>Site Plan Control application on hold pending re-submissions from the applicant.</li>
</ul>
<p><a href="https://glengower.ca/tag/130-huntmar/"><strong>130 Huntmar </strong></a>(Urbandale)</p>
<ul>
<li>The applicant is proposing to develop a mixed-use subdivision comprised of 631 homes and blocks reserved for commercial uses, a school and a park.</li>
<li>Official Plan Amendment, Zoning By-law Amendment and Plan of Subdivision applications on hold pending re-submission to address City staff’s review comments.</li>
</ul>
<p><strong>173 Huntmar </strong>(Urbandale)</p>
<ul>
<li>The applicant is proposing a mixed-use subdivision containing residential and commercial uses.</li>
<li>Plan of Subdivision draft approved in 2016 and extended in 2019.</li>
<li>There is no timeline available for construction.</li>
</ul>
<p><a href="https://glengower.ca/tag/319-huntmar/"><strong>319 Huntmar</strong></a> (Ironclad Developments Inc.)</p>
<ul>
<li>The applicant is proposing to six 6-storey buildings, with a total of 472 apartments, 551 parking spaces through underground and surface parking, and 62 bicycle parking spaces.</li>
<li>In May 2026, the City received a <a href="https://glengower.ca/development/319-huntmar-site-plan-control-application/">Site Plan Control application</a>, which is currently under review.</li>
<li><em>This land is located in Kanata North, but we are updating residents given the proximity to Stittsville.</em></li>
</ul>
<h3>Fernbank area</h3>
<p><a href="https://glengower.ca/tag/1555-shea/"><strong>Westwood Phase 4 (1555 Shea and 5500 Abbott) </strong></a>(CRT – Claridge / Richcraft / Taggart)</p>
<ul>
<li>The applicant is proposing to develop a residential subdivision including 286 detached homes and 324 townhomes, two parks and a block for a future school.</li>
<li>Zoning By-law Amendment and Plan of Subdivision applications on hold pending re-submission to address City staff’s review comments.</li>
</ul>
<p><a href="https://glengower.ca/development/5618-hazeldean-construction-contacts-and-timelines-mintos-abbotts-run/"><strong>5618 Hazeldean (Abbott’s Run)</strong></a><strong> </strong>(Minto)</p>
<ul>
<li>City Council approved a <a href="https://glengower.ca/development/update-next-phases-of-abbotts-run-at-planning-and-housing-committee-june-18/">Zoning By-law Amendment application</a> for Phases 2, 3, 4A and 4B of the subdivision on June 25, 2025 which consists of low-rise residential uses, open space, and mixed-use zones. The applicant is proposing to build 349 detached homes, 569 townhouses, and 461 condos.</li>
<li>A <a href="https://glengower.ca/development/5618-hazeldean-road-abbotts-run-site-plan-control-application/">Site Plan Control application</a> was submitted in August 2025 to construct a Planned Unit Development (PUD) within this new subdivision.</li>
</ul>
<p><a href="https://glengower.ca/tag/723-putney/"><strong>723 Putney Crescent</strong></a><strong> </strong>(CRT Development Inc.)</p>
<ul>
<li>The applicant had proposed in 2021 to build 112 homes in back-to-back townhouses</li>
<li>In August 2026, the applicant resubmitted a Site Plan Control application to build 120 new homes in 10 three-storey stacked townhome buildings. This type of development is permitted under the new zoning bylaw.</li>
<li>The application is currently under review by planning staff.</li>
</ul>
<p><a href="https://glengower.ca/tag/5000-robert-grant/"><strong>5000 Robert Grant</strong></a> (Lépine)</p>
<ul>
<li>City Council approved a zoning by-law amendment application in May 2021 and a <a href="https://glengower.ca/development/5000-robert-grant-site-plan-control-application/">Site Plan Control application</a> was submitted in January 2025.</li>
<li>The applicant is planning to build three apartment buildings surrounding an internal courtyard space and private roundabout road; the proposed buildings are being referred to as “Pavilions”.</li>
<li>Pavilion ‘A’ is a six-storey building with 122 apartments located along Livery Street. Pavilion ‘B’ is a nine-storey building with 163 apartments located along the southern property line. Pavilion ‘C’ is 18-storeys with 219 apartments and 203 square metres of at grade commercial space, located along Robert Grant Avenue.</li>
<li>City Council added a condition to the approval to delay construction of the tallest building in the proposal until Robert Grant Avenue is complete to Maple Grove. About half of the 504 apartments are planned for the tallest building.</li>
</ul>
<p><a href="https://glengower.ca/tag/5100-robert-grant/"><strong>5100 Robert Grant </strong></a>(Regional Group)</p>
<ul>
<li>The City received a Minor Zoning By-law Amendment application in June 2026 to remove a provision that would require the developer to provide a minimum of one contiguous landscaped area or central plaza of at least 2500 square metres. It is still under review and has not been approved.</li>
</ul>
<p><a href="https://glengower.ca/tag/4829-abbott/"><strong>4829 Abbott Street East</strong></a> (Metric Homes)</p>
<ul>
<li>A <a href="https://glengower.ca/development/4829-abbott-street-east-zoning-by-law-amendment-and-site-plan-control-application/">Minor Zoning By-law Amendment application and Site Plan Control application</a> have been approved.</li>
<li>The proposed planned-unit development includes five low-rise stacked apartment buildings, with 12 two-bedroom apartments in each building (60 apartments total). The existing sale centre is proposed to remain, and to be converted into a two-bedroom apartment and a rental management office for the site.</li>
</ul>
<h3>South area</h3>
<p><a href="https://glengower.ca/tag/1650-shea/"><strong>1650 Shea </strong></a>(Cardel)</p>
<ul>
<li>The applicant is proposing to build 13 three-story buildings with back-to-back townhomes. The buildings will have 6, 8, or 10 townhomes each, with a total of 116 homes being proposed for the site. The buildings are to be configured in eight blocks, and the proposal will include six private roads.</li>
<li>A <a href="https://glengower.ca/development/1650-shea-road-site-plan-control-and-plan-of-condominium-application/">Site Plan Control application</a> and <a href="https://glengower.ca/development/1650-shea-road-zoning-by-law-amendment-application/">minor Zoning By-law Amendment application</a> have been approved and construction has started.</li>
</ul>
<p><a href="https://glengower.ca/tag/stittsville-south/"><strong>Stittsville South (W-4) future neighbourhood</strong></a> (Magnolia by Caivan)</p>
<ul>
<li>The applicant is proposing to build approximately 1,700 homes, including detached, townhouse and stacked townhomes, a park, a natural heritage/municipal drain block, and open space blocks.</li>
<li>The City of Ottawa has received <a href="https://glengower.ca/development/stittsville-south-w-4-planning-applications/">Plan of Subdivision and Zoning By-Law amendment applications</a> from Caivan for the property parcels addressed as 5993, 6115, 6141 and 6159 Flewellyn Road and 6070 Fernbank Road.</li>
<li>An <a href="https://glengower.ca/development/qa-from-stittsville-south-w-4-information-meeting/">information meeting</a> was held on October 7, 2025.</li>
<li>In July 2026, the City received a<a href="https://glengower.ca/development/6115-6141-6159-flewellyn-road-site-plan-control-application/"> Site Plan Control application</a> to develop a portion of the larger area. The applicant proposes to build 268 new homes in 13 three-storey stacked townhouses at the addresses of 6115, 6141 &amp; 6159 Flewellyn Road.</li>
<li><em>This land is currently located entirely within Ward 21 (Rideau-Jock), but will be part of Ward 6 Stittsville at the beginning of the next term of Council.</em></li>
</ul>
<p><a href="https://glengower.ca/development/urban-boundary-expansion-5971-flewellyn-road-1770-shea-road-and-1820-shea-road/"><strong>5971 Flewellyn Road, 1770 Shea Road, and 1820 Shea Road</strong></a> (Caivan)</p>
<ul>
<li>In <a href="https://glengower.ca/development/update-stittsville-south-urban-boundary-expansion-comes-to-committee-on-may-20/">May 2026</a>, City Council rejected an <a href="https://glengower.ca/development/urban-boundary-expansion-5971-flewellyn-road-1770-shea-road-and-1820-shea-road/">Official Plan Amendment application</a> to expand the City’s Urban Boundary by including 5971 Flewellyn Road, 1770 Shea Road, and 1820 Shea Road. The expansion would have allowed for the future development of a residential subdivision with approximately 360 homes.</li>
<li>In January 2026, the City also received <a href="https://glengower.ca/development/1770-and-1820-shea-road-plan-of-subdivision-and-zoning-by-law-amendment-application/">Plan of Subdivision and Zoning By-law Amendment applications</a>. A decision will not be rendered on the two applications unless the lands are approved for inclusion into the City’s Urban Boundary.</li>
<li>In October, the applicant submitted a revised proposal that reduced the unit count from 360 to 309.</li>
<li><em>This land is currently located entirely within Ward 21 (Rideau-Jock), but will be part of Ward 6 Stittsville at the beginning of the next term of Council.</em></li>
</ul>
<p><a href="https://glengower.ca/tag/stittsville-west/"><strong>6435 Fernbank Road and 6437 Flewellyn Road</strong></a> (Claridge Homes)</p>
<ul>
<li>The City received an <a href="https://glengower.ca/development/urban-boundary-expansion-area-6435-fernbank-road-and-6437-flewellyn-road/">application to amend the Official Plan</a> to expand the Urban Boundary by including 6437 Flewellyn Road and 6435 Fernbank Road. The proposed expansion, known as the Stittsville West Urban Expansion Area, would allow for a future development of approximately 2,391 new homes.</li>
<li>Planning and Housing Committee <a href="https://glengower.ca/development/update-committee-votes-no-to-stittsville-west-urban-boundary-expansion/">rejected this application</a> on July 8, 2026.</li>
<li>The applicant appealed the Council&#8217;s decision to the Ontario Land Tribunal. <a href="https://glengower.ca/development/info-on-upcoming-olt-hearing-for-6435-fernbank-6437-flewellyn-urban-expansion-appeal/">The case will be heard</a> on Friday, December 11, at 10:00 am.</li>
</ul>
<hr />
<h2>Où en sont les dossiers d’aménagement résidentiel à Stittsville? (Novembre 2026)</h2>
<p>Il y a plus de 30 projets résidentiels à Stittsville, qui en sont à divers stades du processus d’approbation et de préconstruction. Voici les informations les plus récentes que nous avons au début novembre 2026.</p>
<p><strong>Couloir Hazeldean</strong></p>
<p><strong> </strong><a href="https://glengower.ca/tag/560-hazeldean/"><strong>560, chemin Hazeldean</strong></a> (groupe régional / EQ Homes)</p>
<ul>
<li>Le requérant propose de modifier le zonage du site, actuellement désigné « zone agricole, exception rurale 263 », pour y permettre des utilisations résidentielles et non résidentielles futures ainsi que l’ajout d’un espace vert à côté de la rivière Carp.</li>
<li>Le projet prévoit la construction de 98 maisons (50 maisons individuelles et 48 habitations en rangée) ainsi que l’aménagement d’un îlot résidentiel ou à usage mixte sur le chemin Hazeldean.</li>
<li>En octobre 2025, la Ville a reçu une <a href="https://glengower.ca/development/560-hazeldean-zoning-by-law-amendment-and-plan-of-subdivision-application/">demande de modification au Règlement de zonage</a> et une demande d’approbation du plan de lotissement, lesquelles sont en cours d’examen.</li>
<li>Cette demande a été approuvée par le Comité de la planification et du logement lors de sa réunion du mercredi 7 octobre 2026.</li>
</ul>
<p><strong> </strong><a href="https://glengower.ca/tag/5872-hazeldean/"><strong>5872, 5880, 5884, chemin Hazeldean, et 7, promenade Savage</strong></a> (Hazeldean Heights Inc.)</p>
<ul>
<li>La Ville a reçu une nouvelle version de cette demande durant l’été 2026</li>
<li>Le requérant propose maintenant trois immeubles résidentiels de 27 étages, 15 étages et 4 étages.</li>
<li>La nouvelle demande est en cours d’examen.</li>
</ul>
<p><a href="https://glengower.ca/tag/6310-hazeldean/"><strong>6310, chemin Hazeldean</strong></a> (Scalia)</p>
<ul>
<li>Le requérant propose un projet d&#8217;aménagement résidentiel comprenant 457 appartements, dont la hauteur varie de 3 à 21 étages.</li>
<li>Le Conseil municipal a <a href="https://glengower.ca/development/new-info-and-next-steps-for-6310-hazeldean-road/">approuvé la demande de modification du Règlement de zonage</a> le 18 septembre 2024.</li>
<li>En <a href="https://glengower.ca/development/6310-and-6320-hazeldean-road-minor-zoning-by-law-amendment-and-site-plan-control/">novembre 2025</a>, une demande d’approbation du plan d’implantation a été soumise, de même qu’une demande de modification mineure du Règlement de zonage. Ces demandes n’ont pas été approuvées.</li>
</ul>
<p><a href="https://glengower.ca/tag/1174-carp-road/"><strong>1174, chemin Carp</strong></a> (Groupe Maurice)</p>
<ul>
<li>Le requérant propose un ensemble résidentiel comptant 413 logements dont les hauteurs de bâtiments iraient de 5 à 14 étages. Le projet prévoit un mélange de stationnements souterrains et en surface, de même qu’un nouveau parc public.</li>
<li>Le Conseil municipal a <a href="https://glengower.ca/development/update-zoning-for-1174-carp-at-committee-on-september-3-2025/">approuvé la demande de modification du Règlement de zonage</a> le 10 septembre 2025.</li>
<li>Le requérant devra soumettre son plan d’implantation à l’approbation de la Ville.</li>
</ul>
<p><a href="https://glengower.ca/development/site-plan-control-application-for-1145-carp-road-at-hazeldean/"><strong>1145, chemin Carp </strong></a>(Deschenes Poitras Realty Corp)</p>
<ul>
<li>Le requérant propose de construire un immeuble d’habitation de faible hauteur (4 étages) comptant 34 logements.</li>
<li>La demande d’approbation du plan d’implantation a été approuvée.</li>
<li><a href="https://pub-ottawa.escribemeetings.com/Meeting.aspx?Id=cfe3449f-1396-4d3b-8d52-21cd8394d267&amp;Agenda=Agenda&amp;lang=English&amp;Item=12&amp;Tab=attachments">Une demande au Comité de dérogation</a> visant à subdiviser la propriété en deux lots distincts a été approuvée le 15 avril 2025.L’immeuble existant abritant un cabinet dentaire restera sur un lot et l’immeuble d’appartements proposé sera construit sur l’autre lot.</li>
<li>L’échéancier des travaux n’est pas connu.</li>
</ul>
<p><a href="https://glengower.ca/tag/6171-hazeldean/"><strong>6171, chemin Hazeldean </strong></a>(Latitude Homes)</p>
<ul>
<li>Le Conseil municipal a <a href="https://glengower.ca/development/update-6171-hazeldean-road-at-planning-and-housing-committee-on-april-10/">approuvé la demande de modification du Règlement de zonage</a> le 17 avril 2024.</li>
<li>Le requérant propose un lotissement à usage mixte comptant 570 logements en tout, comprenant des maisons individuelles, des habitations en rangée, un immeuble à usage mixte de 9 étages et des immeubles d’habitation de faible hauteur. Le lotissement comprendrait également un grand parc communautaire, un bassin de rétention des eaux pluviales et divers sentiers.</li>
<li>Les travaux ont commencé. Le dynamitage a commencé en <a href="https://glengower.ca/information/blasting-operations-in-the-stittsville-area/">mai 2026</a> et devrait durer trois à quatre mois.</li>
<li>Nous prévoyons d&#8217;autres modifications mineures au Règlement de zonage afin de faciliter la construction de logements de faible hauteur au début du prochain mandat du Conseil municipal.</li>
</ul>
<p><a href="https://glengower.ca/tag/stittsville-north/"><strong>Futur quartier de Stittsville-Nord</strong></a></p>
<ul>
<li>La Ville, en collaboration avec les propriétaires des terrains estampillés « W2 – Stittsville-Nord – futur quartier », entreprend une étude de planification et d’ingénierie pour décider de l’aménagement du nouveau quartier.</li>
<li>Cette étude orientera la modification du Plan officiel pour permettre cet aménagement dans le cadre d’un processus intégré de planification, de conception urbaine et d’ingénierie de l’infrastructure.</li>
<li>Une deuxième réunion portes ouvertes a été tenue en <a href="https://glengower.ca/development/recap-stittsville-north-w2-future-neighbourhood-open-house-2/">mai 2026</a>, durant laquelle ont été présentés aux résidents les conditions actuelles du secteur, les possibilités et contraintes en matière d’aménagement ainsi que trois autres plans conceptuels provisoires.</li>
</ul>
<p><strong>Rue Stittsville Main et secteur central</strong></p>
<p><a href="https://glengower.ca/tag/37-wildpine/"><strong>37, cour Wildpine</strong></a> (Latitude Homes)</p>
<ul>
<li>Le projet prévoit la construction d’un immeuble d’habitation de quatre étages comptant 94 appartements et 1 habitation jumelée. L’aménagement donnera sur une nouvelle rue qui reliera la cour Wildpine et la cour Ravenscroft.</li>
<li>Le Conseil municipal a approuvé la <a href="https://glengower.ca/development/update-37-wildpine-at-planning-and-housing-committee-on-january-15-2025/">demande de modification du Règlement de zonage</a> le 22 janvier 2025.</li>
<li>Un <a href="https://glengower.ca/development/construction-info-for-37-wildpine-court/">permis d’enlèvement d’arbres</a> a été délivré pour les arbres dont l’enlèvement a été approuvé. Des clôtures ont été installées pour délimiter la zone visée. Les travaux ont commencé à la fin novembre 2025.</li>
<li>Une <a href="https://glengower.ca/development/37-wildpine-court-site-plan-control-application/">demande de réglementation du plan d’implantation</a> a été soumise en avril 2026 et est en cours d’examen.</li>
</ul>
<p><a href="https://glengower.ca/tag/121-brae/"><strong>121, croissant Brae </strong></a>(Taion Investments)</p>
<ul>
<li>Le Conseil municipal a <a href="https://glengower.ca/development/update-121-brae-crescent-at-planning-and-housing-committee-on-december-4-2024/">approuvé la demande de modification du Règlement de zonage</a> le 11 décembre 2024.</li>
<li>Le projet prévoit la construction d’un immeuble de trois étages comptant cinq appartements à l’angle du croissant Brae et de la rue Norway Spruce.</li>
<li>L’échéancier des travaux n’est pas connu.</li>
</ul>
<p><a href="https://glengower.ca/development/1835-stittsville-main-street-zoning-by-law-amendment/"><strong>1835, rue Stittsville Main</strong></a> (Jennifer Miller)</p>
<ul>
<li>La Ville a reçu une demande de modification du Règlement de zonage pour ce terrain en 2022 en vue de la construction de deux maisons individuelles supplémentaires. La modification a été approuvée sous condition par le Conseil municipal en raison de problèmes de viabilisation.</li>
<li>Ces problèmes ont été réglés, mais nous croyons comprendre que la propriétaire a l’intention de démolir la maison existante pour construire des logements supplémentaires de faible hauteur, ce qui est permis selon le zonage du terrain.</li>
<li>Aucune demande officielle n&#8217;a encore été déposée concernant ces immeubles collectifs de faible hauteur supplémentaires, et l’échéancier des travaux n’est pas connu.</li>
</ul>
<p><strong>Secteur nord</strong></p>
<p><a href="https://glengower.ca/development/425-culdaff-road-zoning-variance-at-committee-of-adjustment-january-14/"><strong>425, chemin Culdaff</strong></a> (Broadstreet / Seymour Pacific)</p>
<ul>
<li>La <a href="https://glengower.ca/development/425-culdaff-road-site-plan-control-application/">demande d’approbation du plan d’implantation</a> a été approuvée.</li>
<li>Le requérant propose de construire un immeuble d’appartements en forme de U de six étages comptant 177 logements, soit des studios, des logements de 1 chambre, des logements de 2 chambres et des logements de 3 chambres. Il y aurait 212 places de stationnement.</li>
</ul>
<p><a href="https://glengower.ca/tag/1919-maple-grove/"><strong>1919, chemin Maple Grove </strong></a>(Formasian Development Corporation)</p>
<ul>
<li>Le Conseil municipal a approuvé la <a href="https://glengower.ca/development/update-1919-maple-grove-road-at-planning-and-housing-committee-on-december-4-2024/">demande de modification du Règlement de zonage</a> le 11 décembre 2024.</li>
<li>Le requérant propose de construire 36 habitations jumelées et 26 habitations en rangée dos à dos. Il désire aménager un parc et réserver deux îlots pour des immeubles de faible hauteur (4 étages) comptant environ 460 logements. (Ces immeubles ne seront construits que lorsque le prolongement de la rue Stittsville Main, adjacente au terrain, sera terminé.)</li>
<li>Le plan de lotissement provisoire a également été approuvé.</li>
<li>L’échéancier des travaux n’est pas connu.</li>
</ul>
<p><a href="https://glengower.ca/tag/1927-maple-grove/"><strong>1927, chemin Maple Grove</strong></a><strong> </strong>(Landric)</p>
<ul>
<li>Le Conseil municipal a approuvé cette <a href="https://glengower.ca/development/update-1927-maple-grove-road-at-planning-and-housing-committee-on-may-22/">demande de modification du Règlement de zonage</a> le 29 mai 2024.</li>
<li>Une ébauche de la demande de plan de lotissement a été approuvée en 2023 pour subdiviser la propriété en six îlots d’habitations en rangée comptant entre six et sept unités par îlot, pour un total de 38 logements. Tous les logements proposés donneront sur une future rue publique, qui reliera le chemin Maple Grove à un lotissement à venir au nord de la propriété.</li>
<li>L’échéancier des travaux n’est pas connu.</li>
</ul>
<p><a href="https://glengower.ca/tag/1869-maple-grove/"><strong>1869, chemin Maple Grove</strong></a> (Landric Homes)</p>
<ul>
<li>Les demandes d’approbations seront bientôt finalisées, et le promoteur prévoit commencer les travaux bientôt.</li>
</ul>
<p><a href="https://glengower.ca/tag/1981-maple-grove/"><strong>1981, chemin Maple Grove</strong></a><strong> </strong>(Claridge)</p>
<ul>
<li>Le 18 avril 2023, le <a href="https://glengower.ca/development/update-ontario-land-tribunal-decision-for-1981-maple-grove/">Tribunal ontarien de l’aménagement du territoire (TOAT) a ordonné l’approbation</a> des demandes d’ébauche du plan de lotissement et de modification du Règlement de zonage. Le requérant avait trois ans pour enregistrer l’accord de lotissement.</li>
<li>À la suite de l’approbation du TOAT, le Règlement de zonage a été modifié, autorisant la construction de 212 résidences, notamment des habitations isolées, des habitations en rangée et des habitations en rangée dos à dos. Il y aura également un parc public. Le lotissement a été approuvé sous condition.</li>
<li>La Ville est en attente d’un plan conceptuel détaillé. Une première soumission avait été reçue au début de 2024. Le personnel avait formulé des commentaires et attend maintenant une nouvelle version.</li>
<li>Le constructeur devra aussi relier le chemin Maple Grove à la rue Stittsville Main, dans le secteur de Jackson Trails.</li>
<li>L’échéancier des travaux n’est pas connu.</li>
</ul>
<p><a href="https://glengower.ca/development/2765-palladium-site-plan-control-application/"><strong>2765, promenade Palladium</strong></a> (Broadstreet)</p>
<ul>
<li>Le requérant propose de construire trois immeubles d’habitation de six étages comptant 304 appartements résidentiels et 320 places de stationnement.</li>
<li>Il s’agit de la deuxième phase du projet immobilier Palladium Terrace. La première phase consiste en un complexe d’appartements situé juste à côté, au 425, chemin Culdaff (voir ci-dessus).</li>
<li>Aucune modification au Règlement de zonage ne sera nécessaire pour que le projet puisse aller de l’avant.</li>
<li>Le Service de l’urbanisme et de l’aménagement examine actuellement la demande d’approbation du plan d’implantation.</li>
</ul>
<p><a href="https://glengower.ca/development/815-roger-griffiths-avenue-site-plan-control-application/"><strong>815, avenue Roger Griffiths</strong></a> (Richcraft)</p>
<ul>
<li>Le requérant propose de construire deux immeubles d’appartements de trois étages comptant 52 logements et d’aménager six îlots d’habitations en rangée superposées comptant 63 maisons.</li>
<li>La <a href="https://glengower.ca/development/815-roger-griffiths-avenue-site-plan-control-application/">demande d’approbation du plan d’implantation</a> a été approuvée en mai 2026. L’échéancier des travaux n’est pas connu.</li>
</ul>
<p><a href="https://glengower.ca/tag/21-huntmar/"><strong>21, promenade Huntmar </strong></a>(North American Group)</p>
<ul>
<li>Le requérant propose de construire deux immeubles d’habitation de six étages comptant 349 appartements résidentiels et 513 places de stationnement.</li>
<li>La demande de réglementation du plan d’implantation est en suspens dans l’attente d’une nouvelle soumission de la part du requérant.</li>
</ul>
<p><a href="https://glengower.ca/tag/130-huntmar/"><strong>130, promenade Huntmar </strong></a>(Urbandale)</p>
<ul>
<li>Le requérant propose un projet de lotissement à usage mixte qui comptera 631 unités résidentielles, des îlots commerciaux, une école et un parc.</li>
<li>Les demandes de modification du Plan officiel, de modification du Règlement de zonage et de plan de lotissement sont en suspens dans l’attente d’une nouvelle soumission visant à répondre aux commentaires du personnel de la Ville.</li>
</ul>
<p><strong>173, promenade Huntmar </strong>(Urbandale)</p>
<ul>
<li>Le requérant propose un lotissement à usage mixte comprenant des utilisations résidentielles et commerciales.</li>
<li>L’ébauche du plan de lotissement a été approuvée en 2016, puis de nouveau en 2019.</li>
<li>L’échéancier des travaux n’est pas connu.</li>
</ul>
<p><a href="https://glengower.ca/tag/319-huntmar/"><strong>319, promenade Huntmar</strong></a> (Ironclad Developments Inc.)</p>
<ul>
<li>Le requérant propose six immeubles de six étages, pour un total de 472 appartements, de 551 places de stationnement souterraines et en surface et de 62 places de stationnement pour vélos.</li>
<li>En mai 2026, la Ville a reçu une <a href="https://glengower.ca/development/319-huntmar-site-plan-control-application/">demande de réglementation du plan d’implantation</a>, laquelle est en cours d’examen.</li>
<li><em>Le terrain est situé dans Kanata-Nord, mais, compte tenu de sa proximité avec Stittsville, nous transmettons l’information à la population</em><em>.</em></li>
</ul>
<p><strong>Secteur de </strong><strong>Fernbank</strong></p>
<p><a href="https://glengower.ca/tag/1555-shea/"><strong>Westwood Phase 4 (1555, chemin Shea et 5500, rue Abbott) </strong></a>(CRT – Claridge / Richcraft / Taggart)</p>
<ul>
<li>Le requérant propose un projet de lotissement résidentiel comptant 286 habitations isolées et 324 maisons en rangée, 2 parcs et 1 îlot destiné à une future école.</li>
<li>Les demandes de modification du Règlement de zonage et de plan de lotissement sont en suspens dans l’attente de nouvelles versions tenant compte des commentaires du personnel de la Ville.</li>
</ul>
<p><a href="https://glengower.ca/development/5618-hazeldean-construction-contacts-and-timelines-mintos-abbotts-run/"><strong>5618, chemin Hazeldean (Abbott’s Run)</strong></a><strong> </strong>(Minto)</p>
<ul>
<li>Le Conseil municipal a approuvé une <a href="https://glengower.ca/development/update-next-phases-of-abbotts-run-at-planning-and-housing-committee-june-18/">demande de modification du Règlement de zonage</a> pour les phases 2, 3, 4A et 4B du projet le 25 juin 2025. Ce lotissement comprend des zones résidentielles de faible hauteur, des espaces verts et des zones à usage mixte. Le requérant propose de construire 349 habitations isolées, 569 habitations en rangée et 461 logements en copropriété.</li>
<li>Une <a href="https://glengower.ca/development/5618-hazeldean-road-abbotts-run-site-plan-control-application/">demande de réglementation du plan d’implantation</a> a été soumise en août 2025 pour la construction d’un complexe immobilier dans ce nouveau lotissement.</li>
</ul>
<p><a href="https://glengower.ca/tag/723-putney/"><strong>723, croissant Putney</strong></a><strong> </strong>(CRT Development Inc.)</p>
<ul>
<li>En 2021, le requérant avait proposé de construire 112 logements sous forme d’habitations en rangée dos à dos.</li>
<li>En août 2026, le requérant a soumis une nouvelle demande de réglementation du plan d’implantation en vue de bâtir 120 nouveaux logements dans 10 immeubles d’habitations superposées. Ce type d&#8217;aménagement est autorisé en vertu du nouveau Règlement de zonage.</li>
<li>La demande fait actuellement l’objet de l’examen initial du personnel des Services de planification.</li>
</ul>
<p><a href="https://glengower.ca/tag/5000-robert-grant/"><strong>5000, avenue Robert-Grant</strong></a> (Lépine)</p>
<ul>
<li>Le conseil municipal a approuvé une demande de modification du Règlement de zonage en mai 2021 et une <a href="https://glengower.ca/development/5000-robert-grant-site-plan-control-application/">demande de réglementation du plan d’implantation</a> a été soumise en janvier 2025.</li>
<li>Le requérant prévoit construire trois immeubles d’appartements au centre desquels il y aura une cour intérieure et un carrefour giratoire privé; les immeubles seront appelés des « pavillons ».</li>
<li>Situé sur la rue Livery, le pavillon A aura six étages et comptera 122 logements. Le pavillon B, lui, aura neuf étages, comptera 163 logements et sera adjacent à la limite sud de la propriété. Quant au pavillon C, il aura 18 étages, 219 logements et un espace commercial de 203 mètres carrés au rez-de-chaussée, et sera situé sur l’avenue Robert-Grant.</li>
<li>Le Conseil municipal a imposé une condition à l’approbation, soit retarder la construction de l’immeuble le plus haut jusqu’à ce que l’avenue Robert-Grant se rende au chemin Maple Grove. Environ la moitié des 504 logements se trouveront dans cet immeuble.</li>
</ul>
<p><a href="https://glengower.ca/tag/5100-robert-grant/"><strong>5100, avenue Robert-Grant </strong></a>(Regional Group)</p>
<ul>
<li>La Ville a reçu en juin 2026 une demande de modification mineure du Règlement de zonage, qui visait à retirer une disposition exigeant l’aménagement contigu d’au moins un espace paysagé ou d’une esplanade centrale d’un minimum de 2 500 mètres carrés. La demande en cours d’examen n’a pas encore été approuvée.</li>
</ul>
<p><a href="https://glengower.ca/tag/4829-abbott/"><strong>4829, rue Abbott Est</strong></a> (Metric Homes)</p>
<ul>
<li>Une <a href="https://glengower.ca/development/4829-abbott-street-east-zoning-by-law-amendment-and-site-plan-control-application/">demande de modification mineure du Règlement de zonage</a> a été approuvée.</li>
<li>Le projet comprend cinq immeubles d’appartements superposés de faible hauteur, chacun comptant 12 appartements de deux chambres (pour un total de 60 appartements). Il est proposé de conserver le centre de vente et d’en faire un appartement de deux chambres et un bureau de gestion des locations.</li>
</ul>
<p><strong>Secteur sud</strong></p>
<p><a href="https://glengower.ca/tag/1650-shea/"><strong>1650, chemin Shea </strong></a>(Cardel)</p>
<ul>
<li>Le requérant propose de construire 13 immeubles de trois  étages comptant des habitations en rangée dos à dos. Les immeubles compteront 6, 8 ou 10 habitations en rangée chacun, pour un total de 116 habitations. Ils seront configurés en huit îlots. Le projet prévoit la construction de six voies privées.</li>
<li>Une <a href="https://glengower.ca/development/1650-shea-road-site-plan-control-and-plan-of-condominium-application/">demande de réglementation du plan d’implantation</a> et une <a href="https://glengower.ca/development/1650-shea-road-zoning-by-law-amendment-application/">demande de modification mineure du Règlement de zonage</a> ont été approuvées et les travaux ont commencé.</li>
</ul>
<p><a href="https://glengower.ca/tag/stittsville-south/"><strong>Futur quartier de Stittsville-Sud (W-4)</strong></a> (Magnolia by Caivan)</p>
<ul>
<li>Le requérant propose d’aménager un lotissement résidentiel comptant environ 1 700 logements, soit des habitations isolées, des habitations en rangée et des habitations en rangée superposées, ainsi qu’un parc, un îlot occupé par des caractéristiques du patrimoine naturel et le drain municipal et des îlots d’espaces verts.</li>
<li>La Ville a reçu des <a href="https://glengower.ca/development/stittsville-south-w-4-planning-applications/">demandes de modification au Règlement de zonage et de plan de lotissement</a> de Caivan pour les parcelles situées aux 5993, 6115, 6141 et 6159, chemin Flewellyn et au 6070, chemin Fernbank.</li>
<li>Une <a href="https://glengower.ca/development/qa-from-stittsville-south-w-4-information-meeting/">séance d’information publique</a> a eu lieu le 7 octobre 2025.</li>
<li>En juillet 2026, la Ville a reçu une<a href="https://glengower.ca/development/6115-6141-6159-flewellyn-road-site-plan-control-application/"> demande de réglementation du plan d’implantation</a> pour aménager une partie du plus grand secteur. Le requérant propose de construire 268 nouveaux logements dans 13 maisons en rangée de trois étages au 6115, 6141 et 6159, chemin Flewellyn.</li>
<li><em>Ce terrain est actuellement situé entièrement dans le quartier 21 (Rideau-Jock), mais fera partie du quartier 6 Stittsville au début du prochain mandat du Conseil municipal.</em></li>
</ul>
<p><a href="https://glengower.ca/development/urban-boundary-expansion-5971-flewellyn-road-1770-shea-road-and-1820-shea-road/"><strong>5971, chemin Flewellyn, 1770, chemin Shea et 1820, chemin Shea</strong></a> (Caivan)</p>
<ul>
<li>En <a href="https://glengower.ca/development/update-stittsville-south-urban-boundary-expansion-comes-to-committee-on-may-20/">mai 2026</a>, la Ville a rejeté une <a href="https://glengower.ca/development/urban-boundary-expansion-5971-flewellyn-road-1770-shea-road-and-1820-shea-road/">demande de modification du Plan officiel</a> la Ville d’Ottawa a reçu une demande de modification du Plan officiel ayant pour objet d’élargir la limite du secteur urbain de la Ville en y intégrant le 5971, chemin Flewellyn, le 1770, chemin Shea et le 1820, chemin Shea. Cette expansion aurait permis l’aménagement d’un lotissement résidentiel d’environ 360 logements.</li>
<li>En janvier 2026, la Ville a également reçu <a href="https://glengower.ca/development/1770-and-1820-shea-road-plan-of-subdivision-and-zoning-by-law-amendment-application/">des demandes de Plan de lotissement et de modification du Règlement de zonage</a>. Aucune décision ne sera rendue concernant ces deux demandes si l’ajout de ces terrains au secteur urbain n’est pas approuvé.</li>
<li>En octobre, le requérant a soumis une proposition révisée de manière à réduire le nombre de logements de 360 à 309.</li>
<li><em>Ce terrain est actuellement situé entièrement dans le quartier 21 (Rideau-Jock), mais fera partie du quartier 6 Stittsville au début du prochain mandat du Conseil municipal.</em></li>
</ul>
<p><a href="https://glengower.ca/tag/stittsville-west/"><strong>6435, chemin Fernbank et 6437, chemin Flewellyn</strong></a> (Claridge Homes)</p>
<ul>
<li>La Ville a reçu une <a href="https://glengower.ca/development/urban-boundary-expansion-area-6435-fernbank-road-and-6437-flewellyn-road/">demande de modification au Plan officiel</a> afin d’étendre la limite du secteur urbain de la ville en incluant le 6437, chemin Flewellyn et le 6435, chemin Fernbank. Le secteur d’expansion urbaine proposé, appelé Stittsville-Ouest, permettrait la construction d’environ 2 391 nouvelles habitations.</li>
<li>Le Comité de la planification et du logement a <a href="https://glengower.ca/development/update-committee-votes-no-to-stittsville-west-urban-boundary-expansion/">rejeté cette demande</a> le 8 juillet 2026.</li>
<li>Le requérant a fait appel de la décision du Conseil devant le Tribunal ontarien de l’aménagement du territoire (TOAT). <a href="https://glengower.ca/development/info-on-upcoming-olt-hearing-for-6435-fernbank-6437-flewellyn-urban-expansion-appeal/">Le dossier sera entendu</a> le vendredi 11 décembre, à 10 h.</li>
</ul>
<p>&nbsp;</p>
<p>The post <a href="https://glengower.ca/development/whats-the-latest-on-stittsville-residential-development-files-november-2026/">What’s the latest on Stittsville residential development files? (November 2026)</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Info on upcoming OLT hearing for 6435 Fernbank &#038; 6437 Flewellyn urban expansion appeal</title>
		<link>https://glengower.ca/development/info-on-upcoming-olt-hearing-for-6435-fernbank-6437-flewellyn-urban-expansion-appeal/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=info-on-upcoming-olt-hearing-for-6435-fernbank-6437-flewellyn-urban-expansion-appeal</link>
		
		<dc:creator><![CDATA[Team Stittsville]]></dc:creator>
		<pubDate>Tue, 10 Nov 2026 21:04:49 +0000</pubDate>
				<category><![CDATA[Development]]></category>
		<category><![CDATA[official plan]]></category>
		<category><![CDATA[stittsville west]]></category>
		<category><![CDATA[urban expansion]]></category>
		<guid isPermaLink="false">https://glengower.ca/?p=23370</guid>

					<description><![CDATA[<p>La version française suit Our office has received several inquiries about an upcoming Ontario Land Tribunal appeal hearing related to lands at 6435 Fernbank Road &#38; 6437 Flewellyn Road in Stittsville. Some background: Earlier this year, Claridge Homes applied to amend the City’s Official Plan to expand the urban boundary, which would allow the development [&#8230;]</p>
<p>The post <a href="https://glengower.ca/development/info-on-upcoming-olt-hearing-for-6435-fernbank-6437-flewellyn-urban-expansion-appeal/">Info on upcoming OLT hearing for 6435 Fernbank &#038; 6437 Flewellyn urban expansion appeal</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><em>La version française suit</em></p>
<p>Our office has received several inquiries about an upcoming Ontario Land Tribunal appeal hearing related to lands at 6435 Fernbank Road &amp; 6437 Flewellyn Road in Stittsville.</p>
<p>Some background: Earlier this year, Claridge Homes<a href="https://glengower.ca/development/urban-boundary-expansion-area-6435-fernbank-road-and-6437-flewellyn-road/"> applied to amend the City’s Official Plan</a> to expand the urban boundary, which would allow the development of properties at 6437 Flewellyn Road and 6435 Fernbank Road. If approved, this development could have allowed for over 2,000 new homes on the land. In July 2026, <a href="https://glengower.ca/development/update-committee-votes-no-to-stittsville-west-urban-boundary-expansion/">Council rejected this application</a>. The developer has since appealed that decision to the Ontario Land Tribunal, and the <a href="https://jus-olt-prod.powerappsportals.com/en/e-status/details/?id=ab477fa5-79a1-f111-b8de-70a8a50af917">hearing is scheduled</a> for <strong>December 11, 2026.</strong></p>
<p>Some residents have received letters from the law firm Soloway Wright on behalf of the developer that gives notice of this hearing and outlines their rights to participate.</p>
<h3>How to get involved</h3>
<p>Residents can get choose to get involved in the hearing with as either a &#8220;party&#8221; or a &#8220;participant.&#8221;</p>
<ul>
<li><strong>Party status</strong> involves calling their own witnesses and cross examining. Party status would need evidence to call that is unique. The Tribunal is much more selective on who gets Party Status vs. Participant Status</li>
<li><strong>Participant status</strong> has a more limited role than Party Status. Participant Status persons provide a written statement that the Tribunal would take into account when making a decision.</li>
</ul>
<p><strong>More information on the Tribunal process can be found in this video explainer: </strong><a href="https://olt.gov.on.ca/blog/blog/video-to-help-navigate-the-tribunal-process-a-step-by-step-guide-to-requesting-party-or-participant-status/"> A Step-by-Step Guide to Requesting Party or Participant Status | Ontario Land Tribunal</a></p>
<h3>What’s next for urban boundary expansions?</h3>
<p>In 2024, the Provincial Government changed the rules for adding land to the urban boundary. Previously, it could only be done every 5 or 10 years through a comprehensive city-wide review, as part of an Official Plan process. Now, landowners <a href="https://ottawa.ca/en/planning-development-and-construction/residential-property-regulations/development-application-review-process/development-application-submission/development-applications/official-plan-amendment-urban-and-village-boundary-expansion#section-23e30a5f-39eb-48d0-9e91-6a45f507165b">can apply at any time</a> to add land to the urban boundary.</p>
<p>The City has taken the position over the last year that any urban expansion requests are premature, as we are in the process of a comprehensive review of how best to accommodate the population forecasted (a projected increase of over 500,000 people) for Ottawa over the next 25 years. Given this position, staff have recommended and Council has approved several &#8220;no&#8221; decisions for urban expansion applications, and those decisions have been appealed by the applicants.</p>
<p>Staff intend to bring several reports to Council as part of the comprehensive review of growth for the City over the next few months, which ultimately result in an update to the Official Plan. Once the new council meeting schedule is confirmed, the community meeting dates will be announced. If residents want to know more about the comprehensive review, or to stay informed, we recommend you follow the City&#8217;s Engage Page (<a href="https://engage.ottawa.ca/official-plan-update">Official Plan update | Engage Ottawa</a>).</p>
<p>&nbsp;</p>
<hr />
<p>&nbsp;</p>
<div>
<h3>Renseignements sur la prochaine audience du TOAT concernant l’appel relatif à l’expansion urbaine des terrains situés au 6435, chemin Fernbank et au 6437, chemin Flewellyn</h3>
<p>Notre bureau a reçu plusieurs demandes de renseignements au sujet d’une prochaine audience devant le Tribunal ontarien de l’aménagement du territoire (TOAT) concernant les terrains situés au 6435, chemin Fernbank et au 6437, chemin Flewellyn, à Stittsville.</p>
<p>Plus tôt cette année, Claridge Homes <a href="https://glengower.ca/development/urban-boundary-expansion-area-6435-fernbank-road-and-6437-flewellyn-road/">a présenté une demande de modification du Plan officiel de la Ville</a> afin d’agrandir le périmètre urbain, ce qui aurait permis l’aménagement des propriétés situées au 6437, chemin Flewellyn et au 6435, chemin Fernbank. Si elle avait été approuvée, cette proposition aurait permis la construction de plus de 2 000 nouveaux logements sur ces terrains. En juillet 2026, <a href="https://glengower.ca/development/update-committee-votes-no-to-stittsville-west-urban-boundary-expansion/">le Conseil municipal a rejeté cette demande</a>. Le promoteur a depuis porté cette décision en appel devant le Tribunal ontarien de l’aménagement du territoire, et <a href="https://jus-olt-prod.powerappsportals.com/fr-FR/e-status/details/?id=ab477fa5-79a1-f111-b8de-70a8a50af917">l’audience est prévue</a> pour le <strong>11 décembre 2026</strong>.</p>
<p>Certains résidents ont reçu une lettre du cabinet d’avocats Soloway Wright, agissant au nom du promoteur, les informant de cette audience et expliquant leurs droits de participation.</p>
<h3>Comment participer</h3>
<p>Les résidents peuvent choisir de participer à l’audience soit à titre de <strong>partie</strong>, soit à titre de <strong>participant</strong>.</p>
<ul>
<li><strong>Statut de partie : </strong>Le statut de partie permet de présenter ses propres témoins et de procéder à des contre-interrogatoires. Pour obtenir ce statut, il faut généralement disposer d’éléments de preuve uniques à présenter. Le Tribunal accorde ce statut de façon beaucoup plus sélective que le statut de participant.</li>
<li><strong>Statut de participant: </strong>Le statut de participant confère un rôle plus limité. Les participants soumettent une déclaration écrite que le Tribunal prendra en considération au moment de rendre sa décision.</li>
</ul>
<p>Vous pouvez en apprendre davantage sur le processus du Tribunal en consultant cette vidéo explicative : <a href="https://olt.gov.on.ca/fr/blogue/video-pour-mieux-comprendre-le-processus-du-tribunal-un-guide-par-etapes-pour-demander-le-statut-de-partie-ou-de-participant/">Guide étape par étape pour demander le statut de partie ou de participant auprès du Tribunal ontarien de l’aménagement du territoire. </a></p>
<h3>Quelles sont les prochaines étapes pour l’expansion du périmètre urbain?</h3>
<p>En 2024, le gouvernement provincial a modifié les règles entourant l’ajout de terrains au périmètre urbain. Auparavant, ce type de modification ne pouvait être effectué que tous les cinq ou dix ans dans le cadre d’un examen municipal global associé au processus du Plan officiel. Désormais, les propriétaires fonciers peuvent présenter une demande d’agrandissement du périmètre urbain à tout moment</p>
<p>Au cours de la dernière année, la Ville a soutenu que les demandes d’expansion urbaine étaient prématurées, puisqu’elle mène actuellement un examen complet des meilleures façons d’accueillir la croissance prévue de la population, soit plus de 500 000 personnes supplémentaires à Ottawa au cours des 25 prochaines années. En conséquence, le personnel municipal a recommandé, et le Conseil a approuvé, plusieurs refus de demandes d’expansion urbaine. Ces décisions ont ensuite été portées en appel par les demandeurs.</p>
<p>Le personnel municipal prévoit présenter plusieurs rapports au Conseil dans les prochains mois dans le cadre de cet examen global de la croissance. Ce processus mènera ultimement à une mise à jour du Plan officiel. Une fois le calendrier des réunions du Conseil confirmé, les dates des consultations communautaires seront annoncées. Les résidents qui souhaitent en savoir davantage sur cet examen ou rester informés sont invités à consulter la page <a href="https://participons.ottawa.ca/mise-a-jour-du-plan-officiel">Participons Ottawa</a> consacrée à la mise à jour du Plan officiel.</p>
</div>
<p>The post <a href="https://glengower.ca/development/info-on-upcoming-olt-hearing-for-6435-fernbank-6437-flewellyn-urban-expansion-appeal/">Info on upcoming OLT hearing for 6435 Fernbank &#038; 6437 Flewellyn urban expansion appeal</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>UPDATE: 6250 Hazeldean Road: Minor Zoning By-law Amendment and Site Plan</title>
		<link>https://glengower.ca/development/update-6250-hazeldean-road-minor-zoning-by-law-amendment-and-site-plan/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=update-6250-hazeldean-road-minor-zoning-by-law-amendment-and-site-plan</link>
		
		<dc:creator><![CDATA[Team Stittsville]]></dc:creator>
		<pubDate>Mon, 05 Oct 2026 23:51:36 +0000</pubDate>
				<category><![CDATA[Development]]></category>
		<category><![CDATA[6250-hazeldean]]></category>
		<guid isPermaLink="false">https://glengower.ca/?p=23059</guid>

					<description><![CDATA[<p>UPDATE October 5, 2026: This application was approved by City Council on September 9, 2026. Following that, however, a technical error was discovered related to the parcels listed in the zoning bylaw amendment. As a result, the application has been re-opened with the correct information inclusive of 6240 Hazeldean Road and 1179 Carp Road. There [&#8230;]</p>
<p>The post <a href="https://glengower.ca/development/update-6250-hazeldean-road-minor-zoning-by-law-amendment-and-site-plan/">UPDATE: 6250 Hazeldean Road: Minor Zoning By-law Amendment and Site Plan</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>UPDATE October 5, 2026:</strong></p>
<p>This application was approved by City Council on September 9, 2026. Following that, however, a technical error was discovered related to the parcels listed in the zoning bylaw amendment. As a result, the application has been re-opened with the correct information inclusive of 6240 Hazeldean Road and 1179 Carp Road. There are no changes in the details of the application itself or the size of the proposed development. Notifications are being recirculated to the surrounding area.</p>
<p><strong>MISE À JOUR du 5 octobre 2026 </strong></p>
<p>La demande a été approuvée par le Conseil municipal le 9 septembre 2026. Toutefois, on a ensuite relevé une erreur technique en ce qui concerne les parcelles présentées dans la modification du <em>Règlement de zonage</em>. Par conséquent, le dossier a été rouvert et les renseignements exacts y figurent désormais, soit le 6240, chemin Hazeldean et le 1179, chemin Carp. Les changements ne touchent pas les détails de la demande ou la taille de l’aménagement proposé. Des avis sont de nouveau distribués dans la zone environnante.</p>
<hr />
<p>&nbsp;</p>
<p><em>La version française suit</em></p>
<p>The City of Ottawa has received Minor Zoning By-law Amendment and Site Plan Control applications for 6250 Hazeldean Road. The site is at the corner of Hazeldean and Carp where the Petro-Canada gas station is located.</p>
<p>The owner, Suncor, wants to add a single-storey KFC restaurant and drive-thru to the site. The existing gas tank nest, canopy, convenience store and car wash will remain as is.</p>
<p><a href="https://devapps.ottawa.ca/en/applications/D02-02-26-0033/details">More information about the proposal is available on the City’s DevApps site…</a></p>
<h3>Minor Zoning By-law Amendment</h3>
<p>The site is currently zoned Arterial Mainstret, Subzone 9 (AM9) in the City of Ottawa’s Zoning By-law 2008-250, and Mainstreet Zone 2 (MS2) in Zoning By-law 2026-50 that is pending approval. A Minor Zoning By-law Amendment application has been submitted to seek relief from both Zoning By-laws to permit a reduction to the minimum building height, maximum front and corner yard setbacks, and minimum drive-through stacking provisions.</p>
<h3>Site Plan</h3>
<div id="attachment_21163" style="width: 1609px" class="wp-caption aligncenter"><a href="https://glengower.ca/wp-content/uploads/2026/05/Proposed-site-plan-for-6250-Hazeldean-Road.jpg"><img fetchpriority="high" decoding="async" aria-describedby="caption-attachment-21163" class="size-full wp-image-21163" src="https://glengower.ca/wp-content/uploads/2026/05/Proposed-site-plan-for-6250-Hazeldean-Road.jpg" alt="This is a proposed site plan for the addition of a restaurant and drive thru to a gas station at 6250 Hazeldean Road " width="1599" height="1063" srcset="https://glengower.ca/wp-content/uploads/2026/05/Proposed-site-plan-for-6250-Hazeldean-Road.jpg 1599w, https://glengower.ca/wp-content/uploads/2026/05/Proposed-site-plan-for-6250-Hazeldean-Road-1280x851.jpg 1280w, https://glengower.ca/wp-content/uploads/2026/05/Proposed-site-plan-for-6250-Hazeldean-Road-980x651.jpg 980w, https://glengower.ca/wp-content/uploads/2026/05/Proposed-site-plan-for-6250-Hazeldean-Road-480x319.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1599px, 100vw" /></a><p id="caption-attachment-21163" class="wp-caption-text">Proposed site plan for 6250 Hazeldean Road (click image to enlarge)</p></div>
<h3>What is Site Plan Control?</h3>
<p>The site plan control process allows the City to influence land development so that it is safe, functional and orderly. It is also used to ensure that the development standards approved by the City and other agencies are implemented and maintained. Building location, landscape treatment, pedestrian access, drainage control and parking layout are a few of the items addressed during review. Please note that issues such as building height or building use (residential versus commercial, ownership versus rental, etc.) are not a part of a site plan review.</p>
<h3>What&#8217;s next</h3>
<p>This application has not been approved. City staff will be reviewing the application to ensure it complies with applicable provincial policy and city policy and by-laws. Councillor Glen will also be reviewing this application with his team.</p>
<p>Note that under Bill 109 enacted by the Provincial government in 2022, City Council no longer has the final say on Site Plan Control approvals. Although councillors can provide feedback and comments, the final decision rests with City staff.</p>
<p>The Zoning By-law Amendment will be considered under the City’s new Staff delegated authority for Minor Zoning By-law Amendments. Councillor Gower can remove delegated authority if required.</p>
<h3>Stay informed and share your feedback</h3>
<p>For additional information or to provide your comments contact planner Jillian Simpson at <a href="mailto:Jillian.Simpson@ottawa.ca">Jillian.Simpson@ottawa.ca</a>. Please quote File Nos. D02-02-26-0033 and D07-12-26-0044 in the subject line. You can copy Councillor Glen at <a href="mailto:glen.gower@ottawa.ca">glen.gower@ottawa.ca </a>.</p>
<p>Please provide comments by <strong>June 3, 2026</strong>. Comments received after this date will be accepted and considered, however, may not be reflected in the staff report.</p>
<hr />
<h2>6250, chemin Hazeldean : Modification mineure du Règlement de zonage et réglementation du plan d&#8217;implantation</h2>
<p>Des demandes de modification mineure du <em>Règlement de zonage</em> et de réglementation du plan d&#8217;implantation ont été déposées auprès de la Ville d’Ottawa pour le 6250, chemin Hazeldean. Le site se trouve à l’angle du chemin Hazeldean et du chemin Carp, là où est implantée la station d’essence de Petro‑Canada.</p>
<p>La société propriétaire du site, Suncor, veut y aménager un restaurant PFK d’un étage, dont une installation de service au volant. La fosse des réservoirs d’essence, la marquise, le magasin de proximité et le lave‑auto resteront tels quels.</p>
<p><a href="https://devapps.ottawa.ca/fr/applications/D02-02-26-0033/details">Pour en savoir plus sur la proposition, veuillez consulter le site DemDam de la Ville.</a></p>
<h3>Modification mineure du Règlement de zonage</h3>
<p>Le site appartient actuellement à la sous‑zone 9 de la zone d’artère principale (AM9) du <em>Règlement de zonage</em> (n° 2008-250) de la Ville d’Ottawa et à la zone de rue principale 2 (MS2) du <em>Règlement de zonage</em> (n° 2026‑50) de la Ville, qui est en instance d’approbation. Une demande de modification mineure du <em>Règlement de zonage</em> a été déposée pour dispenser de l’application des deux règlements de zonage afin d’autoriser des dérogations permettant de réduire la hauteur minimum du bâtiment, d’augmenter les marges de retrait maximums de la cour avant et de la cour latérale, ainsi que de diminuer la longueur minimum des voies d’attente de l’installation de service au volant.</p>
<h3>Réglementation du plan d&#8217;implantation</h3>
<div id="attachment_21163-2" style="width: 1609px" class="wp-caption aligncenter"><a href="https://glengower.ca/wp-content/uploads/2026/05/Proposed-site-plan-for-6250-Hazeldean-Road.jpg"><img decoding="async" aria-describedby="caption-attachment-21163-2" class="size-full wp-image-21163" src="https://glengower.ca/wp-content/uploads/2026/05/Proposed-site-plan-for-6250-Hazeldean-Road.jpg" alt="This is a proposed site plan for the addition of a restaurant and drive thru to a gas station at 6250 Hazeldean Road" width="1599" height="1063" srcset="https://glengower.ca/wp-content/uploads/2026/05/Proposed-site-plan-for-6250-Hazeldean-Road.jpg 1599w, https://glengower.ca/wp-content/uploads/2026/05/Proposed-site-plan-for-6250-Hazeldean-Road-1280x851.jpg 1280w, https://glengower.ca/wp-content/uploads/2026/05/Proposed-site-plan-for-6250-Hazeldean-Road-980x651.jpg 980w, https://glengower.ca/wp-content/uploads/2026/05/Proposed-site-plan-for-6250-Hazeldean-Road-480x319.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1599px, 100vw" /></a><p id="caption-attachment-21163-2" class="wp-caption-text">Plan d&#8217;implantation pour le 6250, chemin Hazeldean (Veuillez cliquer sur l’image pour l’agrandir.</p></div>
<h3>En quoi consiste la réglementation du plan d’implantation?</h3>
<p>Le <a href="https://ottawa.ca/fr/urbanisme-amenagement-et-construction/reglementation-entourant-les-proprietes-residentielles/le-processus-dexamen-dune-demande-damenagement/depot-de-la-demande/demandes-damenagement/reglementation-des-plans-dimplantation">processus de réglementation du plan d&#8217;implantation</a> permet à la Ville d’orienter l’aménagement foncier pour qu’il soit sécuritaire, fonctionnel et harmonieux. Ce processus permet aussi de s’assurer que les normes d’aménagement approuvées par la Ville et par d’autres organismes sont mises en œuvre et actualisées. La localisation des bâtiments, le traitement paysager, l’accès piétonnier, la régulation du drainage et l’aménagement du stationnement font partie des points traités pendant l’examen. Veuillez noter que les questions comme la hauteur ou la vocation (résidentielle ou commerciale, en propriété ou en location, entre autres) du bâtiment ne font pas partie de l’examen du plan d’implantation.</p>
<h3>Les prochaines étapes</h3>
<p>Cette demande n’a pas été approuvée. Le personnel de la Ville l’examinera pour s’assurer qu’elle respecte les politiques applicables du gouvernement provincial, ainsi que les politiques et les règlements de la Ville. Glen Gower, conseiller municipal, se penchera également sur cette demande avec son équipe.</p>
<p>Veuillez noter que selon le projet de loi 109 adopté par le gouvernement provincial en 2022, le Conseil municipal n’a plus le dernier mot dans l’approbation de la réglementation des plans d’implantation. Même si les conseillers municipaux peuvent livrer des observations et des commentaires, la décision finale appartient au personnel de la Ville.</p>
<p>La modification du <em>Règlement de zonage</em> sera analysée dans le cadre des nouveaux pouvoirs délégués au personnel de la Ville pour les modifications mineures à apporter au <em>Règlement de zonage</em>. Glen Gower, conseiller municipal, peut révoquer au besoin les pouvoirs délégués.</p>
<h3>Pour vous tenir au courant et livrer vos commentaires</h3>
<p>Pour en savoir plus ou pour nous faire parvenir vos commentaires, veuillez communiquer avec Jillian Simpson, urbaniste, par courriel (<a href="mailto:Jillian.Simpson@ottawa.ca">Jillian.Simpson@ottawa.ca</a>). Veuillez rappeler, dans l’objet de votre courriel, les numéros de dossier D02-02-26-0033 et D07-12-26-0044. Vous pouvez mettre en copie conforme Glen Gower, conseiller municipal (<a href="mailto:Glen.Gower@ottawa.ca">Glen.Gower@ottawa.ca</a>).</p>
<p>Veuillez nous adresser vos commentaires d’ici au <strong>3 juin 2026</strong>. Nous prendrons connaissance des commentaires qui nous parviendront après cette date, sans toutefois en tenir compte dans le rapport du personnel.</p>
<p>The post <a href="https://glengower.ca/development/update-6250-hazeldean-road-minor-zoning-by-law-amendment-and-site-plan/">UPDATE: 6250 Hazeldean Road: Minor Zoning By-law Amendment and Site Plan</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>1770 and 1820 Shea Road and 5971 Flewellyn Road: Plan of Subdivision and Zoning By-law amendment application</title>
		<link>https://glengower.ca/development/1770-and-1820-shea-road-plan-of-subdivision-and-zoning-by-law-amendment-application/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=1770-and-1820-shea-road-plan-of-subdivision-and-zoning-by-law-amendment-application</link>
		
		<dc:creator><![CDATA[Team Stittsville]]></dc:creator>
		<pubDate>Thu, 01 Oct 2026 07:20:25 +0000</pubDate>
				<category><![CDATA[Development]]></category>
		<category><![CDATA[caivan]]></category>
		<category><![CDATA[stittsville south]]></category>
		<category><![CDATA[urban expansion]]></category>
		<guid isPermaLink="false">https://glengower.ca/?p=19907</guid>

					<description><![CDATA[<p>Update &#8211; October 1, 2026 The applicant has submitted a revised proposal with the following changes: New address added to subject lands (5971 Flewellyn Road) Unit count reduced from 360 to 309 Mixed-use commercial/residential block (GM Zone) now included The post below has been updated to reflect the revised application. The comment period has re-opened, [&#8230;]</p>
<p>The post <a href="https://glengower.ca/development/1770-and-1820-shea-road-plan-of-subdivision-and-zoning-by-law-amendment-application/">1770 and 1820 Shea Road and 5971 Flewellyn Road: Plan of Subdivision and Zoning By-law amendment application</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Update &#8211; October 1, 2026</strong></p>
<p>The applicant has submitted a revised proposal with the following changes:</p>
<ul data-editing-info="{&quot;applyListStyleFromLevel&quot;:true}">
<li data-ogsc="rgb(0, 0, 0)">
<div class="x_elementToProof" role="presentation" data-ogsc="" data-olk-copy-source="MessageBody">New address added to subject lands (5971 Flewellyn Road)</div>
</li>
<li data-ogsc="rgb(0, 0, 0)">
<div class="x_elementToProof" role="presentation" data-ogsc="">Unit count reduced from 360 to 309</div>
</li>
<li data-ogsc="rgb(0, 0, 0)">
<div class="x_elementToProof" role="presentation" data-ogsc="">Mixed-use commercial/residential block (GM Zone) now included</div>
</li>
</ul>
<p>The post below has been updated to reflect the revised application. The comment period has re-opened, with a new due date of October 27, 2026.</p>
<p>&nbsp;</p>
<p>La demande a été révisée par le requérant et comprend les modifications suivantes :</p>
<ul>
<li>Ajout d’une nouvelle adresse aux terrains visés : 5971, chemin Flewellyn</li>
<li>Réduction du nombre d’unités résidentielles de 360 à 309</li>
<li>Ajout d’un îlot à usage mixte (commercial et résidentiel) dans la zone GM</li>
</ul>
<p>La publication ci-dessous a été mise à jour afin de refléter la demande révisée. La période de consultation publique a été rouverte et les commentaires peuvent être soumis jusqu’au 27 octobre 2026.</p>
<hr />
<p><em>La version française suit </em></p>
<p><em>Originally published February 3, 2026</em></p>
<p>The City of Ottawa has received Plan of Subdivision and Zoning By-law Amendment applications for 1770 and 1820 Shea Road and 5971 Flewellyn Road, located at the northwest corner of the intersection of Shea Road and Flewellyn Road.</p>
<p>The proposal from Caivan is for a residential subdivision that would include a mix of detached homes and townhomes for a total of 309 homes, a new municipal park, a stormwater management facility, and a block reserved for the Faulkner Municipal Drain and its environmental protection buffer.</p>
<p>This land is located entirely within Ward 21 (Rideau-Jock) but given its proximity to Ward 6 (Stittsville) we’re sharing this update for Stittsville residents.</p>
<p>More information about the proposal is available on the City’s DevApps site:</p>
<ul>
<li><a href="https://devapps.ottawa.ca/en/applications/D07-16-25-0011/details">Plan of Subdivision application</a></li>
<li><a href="https://devapps.ottawa.ca/en/applications/D02-02-25-0045/details">Zoning By-law Amendment application</a></li>
</ul>
<p><a href="https://glengower.ca/wp-content/uploads/2026/01/1770-1820-5971_LocationMap.png"><img loading="lazy" decoding="async" class="alignnone wp-image-23014 size-full" src="https://glengower.ca/wp-content/uploads/2026/01/1770-1820-5971_LocationMap.png" alt="" width="602" height="802" srcset="https://glengower.ca/wp-content/uploads/2026/01/1770-1820-5971_LocationMap.png 602w, https://glengower.ca/wp-content/uploads/2026/01/1770-1820-5971_LocationMap-480x639.png 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 602px, 100vw" /></a></p>
<hr />
<h3>Background</h3>
<p>These lands are currently located outside of the City’s Urban Boundary. A separate <a href="https://glengower.ca/development/urban-boundary-expansion-5971-flewellyn-road-1770-shea-road-and-1820-shea-road/">Official Plan Amendment application</a> for an Urban Boundary Expansion is currently under review and proposes to add the lands in the City’s Urban Boundary and re-designate it to “Neighbourhood” under the Suburban Transect. <em>(See below under &#8220;What&#8217;s next&#8221; for more information.)</em></p>
<p>West of the site is the <a href="https://glengower.ca/tag/w-4/">Stittsville South Urban Expansion Area (W-4)</a>, which was previously included in the Urban Boundary as a new growth area. This area has a <a href="https://glengower.ca/development/update-official-plan-amendment-for-stittsville-south-w-4-coming-to-committee-on-september-17/">recently approved</a> concept plan guiding the future development of the lands, to permit a residential subdivision with approximately 1,700 dwelling units.</p>
<p>While applications for 1770 and 1820 Shea Road and 5971 Flewellyn Road are independent from the Stittsville South Urban Expansion Area (W-4), the concept planning for those lands included consideration for these parcels.</p>
<p><a href="https://glengower.ca/wp-content/uploads/2026/01/stittville-south-and-east-parcel.jpg"><img loading="lazy" decoding="async" class="aligncenter wp-image-19926 size-full" src="https://glengower.ca/wp-content/uploads/2026/01/stittville-south-and-east-parcel.jpg" alt="Stittsville South - East Parcel" width="760" height="447" srcset="https://glengower.ca/wp-content/uploads/2026/01/stittville-south-and-east-parcel.jpg 760w, https://glengower.ca/wp-content/uploads/2026/01/stittville-south-and-east-parcel-480x282.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 760px, 100vw" /></a></p>
<hr />
<h3>Plan of Subdivision</h3>
<p>The applicant is proposing a new low-rise residential subdivision consisting of approximately 309 low-rise, low-density homes. The subdivision also proposes a municipal park, stormwater management facility, and municipal drain block. The proposal includes new local roads, with a connection to Shea Road and the abutting Magnolia (Stittsville South) subdivision.</p>
<div id="attachment_19927" style="width: 1590px" class="wp-caption aligncenter"><a href="https://glengower.ca/wp-content/uploads/2026/01/plan-of-subdivision.jpg"><img loading="lazy" decoding="async" aria-describedby="caption-attachment-19927" class="wp-image-19927 size-full" src="https://glengower.ca/wp-content/uploads/2026/01/plan-of-subdivision.jpg" alt="Plan of Subdivision (includes Stittsville South W-4)" width="1580" height="1013" srcset="https://glengower.ca/wp-content/uploads/2026/01/plan-of-subdivision.jpg 1580w, https://glengower.ca/wp-content/uploads/2026/01/plan-of-subdivision-1280x821.jpg 1280w, https://glengower.ca/wp-content/uploads/2026/01/plan-of-subdivision-980x628.jpg 980w, https://glengower.ca/wp-content/uploads/2026/01/plan-of-subdivision-480x308.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1580px, 100vw" /></a><p id="caption-attachment-19927" class="wp-caption-text">Plan of Subdivision (includes Stittsville South W-4)</p></div>
<hr />
<h3>Zoning By-law Amendment</h3>
<p>A zoning by-law amendment application has been submitted to accommodate the proposed land uses for the plan of subdivision. The subject lands are currently zoned Rural Countryside (RU). The application seeks to rezone the lands as follows:</p>
<ul>
<li>R3YY[XXXX] – Residential Third Density, Subzone YY, with an Urban Exception, to permit low-rise residential uses and address site-specific exceptions</li>
<li>O1 – Open Space Zone, for the Hydro Corridor, stormwater management facility (pond), and park</li>
<li>GM, to permit a mixed-use commercial and residential block.</li>
</ul>
<hr />
<h3>What’s next</h3>
<p>This development has not been approved. The Official Plan Urban Boundary Expansion to add the subject lands to the City’s Urban Boundary is a pre-requisite to the plan of subdivision and zoning by-law amendment applications. <strong>A decision will not be rendered on the two applications unless the lands are approved for inclusion into the City’s Urban Boundary.</strong></p>
<p>City staff are reviewing the proposal, as are the Councillor and his team.</p>
<hr />
<h3>Stay informed and provide feedback</h3>
<p>Register for future notifications about this application and provide your comments by contacting Stream Shen at 613-580-2424, ext. 24488 or <a href="mailto:stream.shen@ottawa.ca">stream.shen@ottawa.ca</a> and including File No. D07-16-25-0011 &amp; D02-02-25-0045 in the subject line. You can copy Councillor Glen at <a href="mailto:glen.gower@ottawa.ca">glen.gower@ottawa.ca</a>.</p>
<p>Deadline for comments is <strong>October 27</strong><strong>, 2026</strong>. Please note, comments will continue to be accepted and considered after the initial comment period due date noted above. However, comments received after the above date may not be reflected in the staff report.</p>
<hr />
<h2>1770 et 1820, chemin Shea, et 5971, chemin Flewellyn : Demandes d’approbation du plan de lotissement et de modification du Règlement de zonage</h2>
<p>La Ville d’Ottawa a reçu une demande d’approbation du plan de lotissement et une demande de modification du <em>Règlement de zonage</em> pour les terrains situés aux 1770 et 1820, chemin Shea, et 5971, chemin Flewellyn à l’angle nord-ouest de l’intersection des chemins Shea et Flewellyn.</p>
<p>Le projet prévoit l’aménagement d’un lotissement résidentiel comprenant un mélange de maisons individuelles et en rangée, pour un total de 309 habitations, ainsi qu’un nouveau parc municipal, une installation de gestion des eaux pluviales et un îlot réservé au drain municipal Faulkner et à sa zone tampon de protection environnementale.</p>
<p>Ces terrains se trouvent entièrement dans le quartier 21 (Rideau-Jock), mais compte tenu de leur proximité avec le quartier 6 (Stittsville), le présent bulletin d’information est également transmis aux résidentes et résidents de Stittsville.</p>
<p>Pour en savoir plus sur le projet, consultez la page de la Ville consacrée aux demandes d’aménagement :</p>
<ul>
<li><a href="https://devapps.ottawa.ca/fr/applications/D07-16-25-0011/details">Demande d’approbation du plan de lotissement</a>;</li>
<li><a href="https://devapps.ottawa.ca/fr/applications/D02-02-25-0045/details">Demande de modification du <em>Règlement de zonage</em></a>.</li>
</ul>
<p><a href="https://glengower.ca/wp-content/uploads/2026/01/1770-1820-5971_LocationMap.png"><img loading="lazy" decoding="async" class="alignnone wp-image-23014 size-full" src="https://glengower.ca/wp-content/uploads/2026/01/1770-1820-5971_LocationMap.png" alt="" width="602" height="802" srcset="https://glengower.ca/wp-content/uploads/2026/01/1770-1820-5971_LocationMap.png 602w, https://glengower.ca/wp-content/uploads/2026/01/1770-1820-5971_LocationMap-480x639.png 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 602px, 100vw" /></a></p>
<hr />
<h3>Contexte</h3>
<p>Les terrains visés se trouvent actuellement à l’extérieur des limites du secteur urbain de la ville. Une <a href="https://glengower.ca/development/urban-boundary-expansion-5971-flewellyn-road-1770-shea-road-and-1820-shea-road/">demande de modification du Plan officiel</a> distincte, visant à élargir ces limites, est en cours d’examen. Elle propose d’intégrer ces terrains au secteur urbain et de les désigner comme « quartiers » du transect du secteur de banlieue. <em>(Pour en savoir plus, reportez-vous à la section « Prochaines étapes » ci-dessous.)</em></p>
<p>À l’ouest de l’emplacement se trouve la <a href="https://glengower.ca/tag/w-4/">zone d’expansion urbaine de Stittsville-Sud (W-4)</a>, qui a été intégrée aux limites du secteur urbain comme nouvelle zone de croissance. Cette zone fait l’objet d’un plan conceptuel d’aménagement futur <a href="https://glengower.ca/development/update-official-plan-amendment-for-stittsville-south-w-4-coming-to-committee-on-september-17/">récemment approuvé</a> qui permettra la création d’un lotissement résidentiel comptant environ 1 700 logements.</p>
<p>Bien que les demandes relatives aux 1770 et 1820, chemin Shea, et 5971, chemin Flewellyn ne concernent pas la zone d’expansion urbaine de Stittsville-Sud (W-4), ces parcelles ont été prises en compte dans la planification conceptuelle.</p>
<p><a href="https://glengower.ca/wp-content/uploads/2026/01/stittville-south-and-east-parcel.jpg"><img loading="lazy" decoding="async" class="aligncenter size-full wp-image-19926" src="https://glengower.ca/wp-content/uploads/2026/01/stittville-south-and-east-parcel.jpg" alt="Stittsville South east parcel location" width="760" height="447" srcset="https://glengower.ca/wp-content/uploads/2026/01/stittville-south-and-east-parcel.jpg 760w, https://glengower.ca/wp-content/uploads/2026/01/stittville-south-and-east-parcel-480x282.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 760px, 100vw" /></a></p>
<hr />
<h3>Plan de lotissement</h3>
<p>Le requérant propose d’aménager un lotissement résidentiel comprenant environ 309 habitations de faible hauteur et de faible densité, un parc municipal, une installation de gestion des eaux pluviales et un îlot pour le drain municipal. Le projet prévoit également de nouvelles routes locales avec un accès au chemin Shea et au lotissement Magnolia voisin (Stittsville-Sud).</p>
<div id="attachment_19927-2" style="width: 1590px" class="wp-caption aligncenter"><a href="https://glengower.ca/wp-content/uploads/2026/01/plan-of-subdivision.jpg"><img loading="lazy" decoding="async" aria-describedby="caption-attachment-19927-2" class="wp-image-19927 size-full" src="https://glengower.ca/wp-content/uploads/2026/01/plan-of-subdivision.jpg" alt="Plan de lotissement (comprenant la zone de Stittsville-Sud W-4)" width="1580" height="1013" srcset="https://glengower.ca/wp-content/uploads/2026/01/plan-of-subdivision.jpg 1580w, https://glengower.ca/wp-content/uploads/2026/01/plan-of-subdivision-1280x821.jpg 1280w, https://glengower.ca/wp-content/uploads/2026/01/plan-of-subdivision-980x628.jpg 980w, https://glengower.ca/wp-content/uploads/2026/01/plan-of-subdivision-480x308.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1580px, 100vw" /></a><p id="caption-attachment-19927-2" class="wp-caption-text">Plan de lotissement (comprenant la zone de Stittsville-Sud W-4)</p></div>
<hr />
<h3>Modification du Règlement de zonage</h3>
<p>Une demande de modification du <em>Règlement de zonage</em> a été déposée pour autoriser les utilisations du sol proposées. Elle vise à modifier le zonage des terrains visés, qui appartiennent actuellement à la zone d’espace rural (RU), comme suit :</p>
<ul>
<li>R3YY [XXXX] – Zone résidentielle de densité 3, sous-zone YY, exception urbaine, pour permettre l’aménagement d’habitations de faible hauteur et prévoir des exceptions propres à l’emplacement.</li>
<li>O1 – Zone d’espace ouvert, pour le couloir de transport d’électricité, l’installation de gestion des eaux pluviales (étang) et le parc.</li>
<li>zone polyvalente générale (GM) pour autoriser un îlot commercial et un îlot résidentiel</li>
</ul>
<hr />
<h3>Prochaines étapes</h3>
<p>Ce projet n’a pas encore été approuvé. Les terrains visés doivent d’abord être intégrés aux limites du secteur urbain du Plan officiel pour que la Ville puisse examiner les demandes d’approbation du plan de lotissement et de modification du <em>Règlement de zonage</em>. <strong>Aucune décision ne sera rendue concernant ces deux demandes tant que l’élargissement des </strong><strong>limites du secteur urbain </strong><strong>n’aura pas été approuvé.</strong></p>
<p>Le personnel de la Ville examine actuellement la proposition, tout comme le conseiller et son équipe.</p>
<hr />
<h3>Renseignements et commentaires</h3>
<p>Pour recevoir les prochains avis sur ces demandes ou transmettre vos commentaires, communiquez avec Stream Shen au 613-580-2424, poste 24488 ou à <a href="mailto:stream.shen@ottawa.ca">stream.shen@ottawa.ca</a> en indiquant « Dossiers n<sup>os</sup> D07-16-25-0011 et D02-02-25-0045 » en objet. Vous pouvez aussi mettre en copie conforme le conseiller Glen Gower (<a href="mailto:glen.gower@ottawa.ca">glen.gower@ottawa.ca</a>).</p>
<p>Vous avez jusqu’au <strong>27 octobre 2026</strong> pour formuler des commentaires. Les commentaires reçus après cette date seront acceptés et examinés, mais ne seront pas nécessairement pris en compte dans le rapport du personnel.</p>
<p>The post <a href="https://glengower.ca/development/1770-and-1820-shea-road-plan-of-subdivision-and-zoning-by-law-amendment-application/">1770 and 1820 Shea Road and 5971 Flewellyn Road: Plan of Subdivision and Zoning By-law amendment application</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Demolition at 2 Pretty Street to begin late September</title>
		<link>https://glengower.ca/development/demolition-at-2-pretty-street-to-begin-late-september/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=demolition-at-2-pretty-street-to-begin-late-september</link>
		
		<dc:creator><![CDATA[Team Stittsville]]></dc:creator>
		<pubDate>Fri, 25 Sep 2026 13:57:22 +0000</pubDate>
				<category><![CDATA[Development]]></category>
		<category><![CDATA[affordable housing]]></category>
		<category><![CDATA[pretty street community centre]]></category>
		<guid isPermaLink="false">https://glengower.ca/?p=22921</guid>

					<description><![CDATA[<p>La version française suit This month, the City of Ottawa will begin demolition of the former Pretty Street Community Centre building at 2 Pretty Street in order to prepare the site for future not-for-profit housing. Work is expected to begin in the last week of September. Demolition activities are planned to occur over approximately two [&#8230;]</p>
<p>The post <a href="https://glengower.ca/development/demolition-at-2-pretty-street-to-begin-late-september/">Demolition at 2 Pretty Street to begin late September</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><em>La version française suit</em></p>
<p>This month, the City of Ottawa will begin demolition of the former Pretty Street Community Centre building at 2 Pretty Street in order to prepare the site for future not-for-profit housing.</p>
<p>Work is expected to begin in the last week of September. Demolition activities are planned to occur over approximately two to three weeks, with site restoration and grading activities following thereafter. All work should be substantially complete by the end of October 2026.</p>
<p>As is common for construction projects, you may experience inconvenience during this work, such as traffic delays, noise, and dust. The contractor will take every precaution to minimize interruptions to your daily life.</p>
<p>A <a href="https://glengower.ca/notebook/notebook-whats-next-for-the-pretty-street-community-centre/">2022 building audit for the Pretty Street building</a> found the centre to be in “poor condition and nearing critical condition” in large part due to a significant mould issue in the basement. Earlier this year, the City <a href="https://glengower.ca/development/2-pretty-street-request-for-proposals/">launched a process to select a not-for-profit housing</a> provider to develop a low-rise rental apartment building for the property. This anticipated development will require a Site Plan Control approval, which includes a public notification process—detailed plans for review will be made available when that time comes.</p>
<p>&nbsp;</p>
<h3>Contact information</h3>
<ul>
<li>For any emergency outside normal working hours, please call the City at 3-1-1.</li>
<li>For general project information, please contact the City’s Project Manager Andrew Campbell, (613) 316-8205 or <a href="mailto:andrewm.campbell@ottawa.ca">andrewm.campbell@ottawa.ca</a></li>
<li>For construction related questions or concerns, please contact the Contractor Representatives, Paul Matergio (Concentric Associates), (613) 824-8900</li>
<li>For information about the the housing development that will be constructed in its place, please contact Cameron Hodgins, <a href="mailto:cameron.hodgins@ottawa.ca">cameron.hodgins@ottawa.ca</a></li>
</ul>
<hr />
<p>&nbsp;</p>
<p>&nbsp;</p>
<h2>Début des travaux de démolition au 2, rue Pretty à la fin de septembre</h2>
<p>Ce mois-ci, la Ville d’Ottawa entreprendra la démolition de l’ancien centre communautaire situé au 2, rue Pretty, afin de préparer le site pour de futurs logements sans but lucratif.</p>
<p>Les travaux devraient commencer pendant la dernière semaine de septembre. Les activités de démolition devraient se dérouler sur environ deux à trois semaines, suivies des travaux de remise en état du site et de nivellement. Tous les travaux devraient être achevés en grande partie d’ici la fin d’octobre 2026.</p>
<p>Comme c’est souvent le cas lors de travaux de construction, vous pourriez subir des inconvénients pendant la durée du chantier, notamment des retards de circulation, du bruit et de la poussière. L’entrepreneur prendra toutes les précautions nécessaires pour minimiser les interruptions de votre vie quotidienne.</p>
<p>Une <a href="https://glengower.ca/notebook/notebook-whats-next-for-the-pretty-street-community-centre/">vérification de l’état du bâtiment réalisée en 2022 pour l’immeuble de la rue Pretty</a> a révélé que le centre était dans un « état précaire et s’approchait d’un état critique », en grande partie en raison d’un problème majeur de moisissure au sous-sol. Plus tôt cette année, la Ville a <a href="https://glengower.ca/development/2-pretty-street-request-for-proposals/">lancé une démarche en vue de sélectionner un fournisseur de logements</a> sans but lucratif afin de construire un immeuble d’habitation locatif de faible hauteur sur le terrain. Ce projet d’aménagement nécessitera une approbation de la réglementation du plan d’implantation, ce qui comprend un processus d’avis public; des plans détaillés à examiner seront rendus disponibles le moment venu.</p>
<p>&nbsp;</p>
<h3>Les coordonnées</h3>
<ul>
<li>Pour toute urgence en dehors des heures normales de travail la semaine et la fin de semaine, veuillez téléphoner à la Ville au 3-1-1.</li>
<li>Pour des renseignements généraux sur le projet, veuillez communiquer avec le gestionnaire de projet de la Ville, Andrew Campbell, au 613-316-8205 ou à <a href="mailto:andrewm.campbell@ottawa.ca">andrewm.campbell@ottawa.ca</a>.</li>
<li>Pour toute question ou préoccupation liée à la construction, veuillez communiquer avec le représentant de l’entrepreneur, Paul Matergio (Concentric Associates), au 613 824-8900.</li>
<li>Pour obtenir des renseignements sur l’aménagement de logements qui sera construit à cet endroit, veuillez communiquer avec Cameron Hodgins à <a href="mailto:cameron.hodgins@ottawa.ca">cameron.hodgins@ottawa.ca</a>.</li>
</ul>
<p>&nbsp;</p>
<p>The post <a href="https://glengower.ca/development/demolition-at-2-pretty-street-to-begin-late-september/">Demolition at 2 Pretty Street to begin late September</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>560 Hazeldean development application goes to Planning &#038; Housing Committee October 7</title>
		<link>https://glengower.ca/development/560-hazeldean-development-application-goes-to-planning-housing-committee-october-7/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=560-hazeldean-development-application-goes-to-planning-housing-committee-october-7</link>
		
		<dc:creator><![CDATA[Team Stittsville]]></dc:creator>
		<pubDate>Tue, 22 Sep 2026 20:45:08 +0000</pubDate>
				<category><![CDATA[Development]]></category>
		<category><![CDATA[560-hazeldean]]></category>
		<category><![CDATA[fernbank]]></category>
		<category><![CDATA[Planning and Housing Committee]]></category>
		<guid isPermaLink="false">https://glengower.ca/?p=22905</guid>

					<description><![CDATA[<p>UPDATE (October 7, 2026): This application was approved by the Planning &#38; Housing Committee at their meeting on Wednesday, October 7. La version française suit The application for a zoning bylaw amendment at 560 Hazeldean Road will be considered for approval by the City of Ottawa’s Planning &#38; Housing Committee on Wednesday, October 7, 2026. The [&#8230;]</p>
<p>The post <a href="https://glengower.ca/development/560-hazeldean-development-application-goes-to-planning-housing-committee-october-7/">560 Hazeldean development application goes to Planning &#038; Housing Committee October 7</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>UPDATE (October 7, 2026): </strong>This application was approved by the Planning &amp; Housing Committee at their meeting on Wednesday, October 7.</p>
<p><em>La version française suit</em></p>
<p>The application for a zoning bylaw amendment at <a href="https://glengower.ca/development/560-hazeldean-zoning-by-law-amendment-and-plan-of-subdivision-application/">560 Hazeldean Road</a> will be considered for approval by the City of Ottawa’s Planning &amp; Housing Committee on <strong>Wednesday, October 7, 2026.</strong></p>
<p>The proposal is to rezone the site, which is currently used as a golf practice facility, to allow the development of 98 homes (50 single detached homes and 48 townhomes). An Arterial Mainstreet Zone is proposed to apply to the northern portion of the site along Hazeldean, for which a future Site Plan Control application will be submitted to construct a residential/mixed-use development block.</p>
<p>If you have comments on this file that you would like to share with the Committee, there are several ways that you can do so:</p>
<ol>
<li><strong>Submit comments in writing:</strong><br />
To submit comments in writing, email the Committee Coordinator (<a href="mailto:Kelly.Crozier@ottawa.ca">Kelly.Crozier@ottawa.ca</a>). Comments received by 4:00 pm on Tuesday, October 6 will be provided to Members of Committee and Council prior to the meeting. Comments received after this time will be forwarded to Members of Committee and Council as soon as possible, and prior to Council’s final consideration of the item later in the month but may not be received by Committee members prior to the October 7 meeting.</li>
<li><strong>Submit verbal comments in advance of the meeting:<br />
</strong>Call the Committee Coordinator by 4:00 pm on Tuesday, October 6 to have comments transcribed (613-580-2424, x16875).</li>
<li><strong>Register to speak at the committee meeting*:</strong><br />
<strong>i. Register by phone by 4:00 pm on October 6:<br />
</strong>You may contact the Committee Coordinator at 613-580-2424, x16875.<br />
<strong>ii. Register by e-mail – prior to 8:30 am on Wednesday, October 7:</strong><br />
You may contact the Committee Coordinator at <a href="mailto:Kelly.Crozier@ottawa.ca">Kelly.Crozier@ottawa.ca</a><br />
*Visual presentations must be submitted by 4:00 PM on Tuesday, October 6, 2025.</li>
</ol>
<p>You can also contact <a href="mailto:glen.gower@ottawa.ca">Councillor Glen</a> with your questions or concerns.</p>
<p>A copy of the report outlining the Planning Department&#8217;s recommendations to the Committee will be circulated to the public on October 1, 2026<b data-ogsc="">. </b>More information on the proposed development, including all documents related to the application, can be found on the <a href="https://devapps.ottawa.ca/en/applications/D02-02-25-0059/details">City&#8217;s DevApps page</a>.</p>
<hr />
<p>&nbsp;</p>
<h2>Examen de la demande d’aménagement du 560, chemin Hazeldean par le Comité de la planification et du logement le 7 octobre</h2>
<p>La demande de modification du Règlement de zonage concernant le <a href="https://glengower.ca/development/560-hazeldean-zoning-by-law-amendment-and-plan-of-subdivision-application/">560, chemin Hazeldean</a>, sera examinée par le Comité de la planification et du logement de la Ville d’Ottawa le<strong> mercredi 7 octobre 2026</strong> en vue de son approbation.</p>
<p>La proposition porte sur un changement de zonage du site, qui sert actuellement de terrain d’entraînement de golf, afin de permettre la construction de 98 habitations (50 maisons individuelles et 48 maisons en rangée). Elle propose de désigner la partie nord du site, le long de Hazeldean, en tant que zone d’artère principale, laquelle partie fera l’objet d’une demande de réglementation du plan d’implantation en vue de la construction d’un îlot résidentiel à usage mixte.</p>
<p>Plusieurs moyens s’offrent à vous pour soumettre vos commentaires au Comité.</p>
<ol>
<li><strong>Soumettre vos commentaires par écrit </strong><br />
Pour soumettre des commentaires par écrit, envoyez un courriel à la coordonnatrice du Comité (<a href="mailto:Kelly.Crozier@ottawa.ca">Crozier@ottawa.ca</a>). Les commentaires reçus avant 16 h le mardi 6 octobre seront transmis aux membres du Comité et du Conseil avant la réunion. Les commentaires reçus après cette date seront transmis aux membres du Comité et du Conseil dès que possible et avant l’examen final de ce point par le Conseil plus tard dans le mois; toutefois, il se peut qu’ils ne parviennent pas aux membres du Comité avant la réunion du 7 octobre.</li>
<li><strong>Soumettre vos commentaires par voie orale avant la réunion</strong><br />
Veuillez appeler la coordonnatrice du Comité avant 16 h le mardi 6 octobre pour que vos commentaires soient transcrits (613-580-2424, poste 16875).</li>
<li><strong>S’inscrire pour prendre la parole pendant la réunion du Comité*<br />
S’inscrire par téléphone avant le 6 octobre à 16 h</strong><br />
Vous pouvez communiquer avec la coordonnatrice du Comité en composant le 613-580-2424, poste 16875.<strong><br />
ii. S’inscrire par courriel avant le mercredi 7 octobre à 8 h 30</strong><br />
Vous pouvez communiquer avec la coordonnatrice du Comité à l’adresse <a href="mailto:Kelly.Crozier@ottawa.ca">Kelly.Crozier@ottawa.ca</a>.<br />
*Les présentations visuelles doivent être soumises avant 16 h le lundi 6 octobre 2025.</li>
</ol>
<p>Vous pouvez également communiquer avec le <a href="mailto:glen.gower@ottawa.ca">conseiller Glen Gower</a> pour toute question ou préoccupation.</p>
<p>Une copie du rapport présentant les recommandations de la Direction générale de la planification au Comité sera mise à la disposition du public le 1<sup>er</sup> octobre 2026. Pour plus d’informations sur ce projet, y compris tous les documents relatifs à la demande, consultez la page <a href="https://devapps.ottawa.ca/fr/applications/D02-02-25-0059/details">DemDam de la Vill</a><u>e</u>.</p>
<p>The post <a href="https://glengower.ca/development/560-hazeldean-development-application-goes-to-planning-housing-committee-october-7/">560 Hazeldean development application goes to Planning &#038; Housing Committee October 7</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Progress update on park projects in Stittsville (September 2026)</title>
		<link>https://glengower.ca/development/progress-update-on-park-projects-in-stittsville-september-2026/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=progress-update-on-park-projects-in-stittsville-september-2026</link>
		
		<dc:creator><![CDATA[Glen Gower]]></dc:creator>
		<pubDate>Sat, 19 Sep 2026 18:45:41 +0000</pubDate>
				<category><![CDATA[Development]]></category>
		<category><![CDATA[Information]]></category>
		<category><![CDATA[parks]]></category>
		<guid isPermaLink="false">https://glengower.ca/?p=22883</guid>

					<description><![CDATA[<p>La version française suit We have several new parks under construction and several older parks receiving upgrades in Stittsville. Here’s the latest information on each project as of September 2026. New parks Fernbank District Park (Abbott/Lift/Clintonia/Rouncey) Draft plans are now available and City staff continue to collect feedback. Our office will be hosting a pop-up [&#8230;]</p>
<p>The post <a href="https://glengower.ca/development/progress-update-on-park-projects-in-stittsville-september-2026/">Progress update on park projects in Stittsville (September 2026)</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><em>La version française suit</em></p>
<p><span data-contrast="auto">We have several new parks under construction and several older parks receiving upgrades in Stittsville. Here’s the latest information on each project as of September 2026.</span></p>
<h2>New parks</h2>
<p><b><span data-contrast="auto"><a href="https://glengower.ca/tag/fernbank-district-park/">Fernbank District Park</a> (Abbott/Lift/Clintonia/Rouncey)<br />
</span></b><a href="https://glengower.ca/information/fernbank-district-park-consultation-begins/">Draft plans are now available</a> and City staff continue to collect feedback. Our office will be hosting <a href="https://glengower.ca/tag/fernbank-district-park/">a pop-up consultation</a> for the new Fernbank District Park on Saturday, October 3,</p>
<p><a href="https://glengower.ca/development/cope-park-fernbank-community-park-3-concept-design/"><b><span data-contrast="none">Brummell-Curry Park (Cope at Dagenham in Westwood)</span></b></a><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"><br />
</span><span data-contrast="auto">Previously referred to as Cope Park. Construction has started and will be completed in 2027.</span></p>
<p><a href="https://glengower.ca/development/dagenham-park-concept-design-westwood/"><b><span data-contrast="none">Dagenham Park (Dagenham at David Wiens in Westwood)</span></b></a><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"><br />
</span><span data-contrast="auto">Previously referred to as David Wiens Park. Construction is expected to begin soon with completion in 2027.</span></p>
<p><a href="https://glengower.ca/information/new-granary-grove-park-concept-plans/"><b><span data-contrast="none">Granary Grove Park (Granary and Craig Duncan in Shea Village)</span></b></a><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"><br />
</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}">Cavanagh is targeting Fall 2026 to start construction of the park, and completion in summer 2027.</span></p>
<p><a href="https://glengower.ca/development/update-construction-is-starting-on-the-idylea-linear-park-and-pathway/"><b><span data-contrast="none">Idylea Linear Park (west side of the Idylea neighbourhood)</span></b></a><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"><br />
</span><span data-contrast="auto">This is a north-south pathway link that connects Fernbank Road to Kemp Woodlands, with homes on Caribou and Liard backing onto it as well. Construction is underway and will be completed along with future phases of the Idylea neighbourhood.</span></p>
<p><a href="https://glengower.ca/information/update-shea-woods-dog-park/"><b><span data-contrast="none">Shea Woods – future off-leash dog park</span></b></a><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"><br />
</span><span data-contrast="auto">In 2022, City Council approved an agreement to acquire and protect approximately five hectares of Shea Woods, and protect the forest as a part of a public park. That acquisition is now complete, and the land is owned by the City of Ottawa.</span> <span data-contrast="auto">In the next year or so, the City will be undertaking engagement to finalize the park plans.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"> </span></p>
<p>&nbsp;</p>
<h2>Park upgrades</h2>
<p><a href="https://glengower.ca/notebook/notebook-more-cricket-spaces-coming-to-stittsville/"><strong>Bradley-Craig Park – Cricket pitch (Cranesbill)</strong></a><br />
Final design is underway, and installation is expected in 2026.</p>
<p><a href="https://glengower.ca/information/stitt-street-park-playground-renewal-concept-designs/"><b><span data-contrast="none">Stitt Street Park – Play structure replacement (Stitt Street)</span></b></a><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"><br />
</span><span data-contrast="auto">Public consultation for this project took place in January 2026. </span><span data-contrast="auto">Construction is underway to replace the older play structure and should be substantially competed by the end of fall 2026.</span></p>
<p><strong>Rouncey Park &#8211; Rink boards</strong><br />
New rinkboards are being added for the outdoor skating rink. Construction to be completed before Winter 2026.</p>
<p>&nbsp;</p>
<h2><a href="https://glengower.ca/development/progress-update-on-park-projects-in-stittsville-september-2026/attachment/map-of-park-construction-projects-sept-2026/" rel="attachment wp-att-22884"><img loading="lazy" decoding="async" class="aligncenter size-full wp-image-22884" src="https://glengower.ca/wp-content/uploads/2026/09/map-of-park-construction-projects-sept-2026-scaled.jpg" alt="Map of Stittsville park construction projects" width="2560" height="1440" srcset="https://glengower.ca/wp-content/uploads/2026/09/map-of-park-construction-projects-sept-2026-scaled.jpg 2560w, https://glengower.ca/wp-content/uploads/2026/09/map-of-park-construction-projects-sept-2026-1280x720.jpg 1280w, https://glengower.ca/wp-content/uploads/2026/09/map-of-park-construction-projects-sept-2026-980x551.jpg 980w, https://glengower.ca/wp-content/uploads/2026/09/map-of-park-construction-projects-sept-2026-480x270.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw" /></a></h2>
<hr />
<p>&nbsp;</p>
<h2>Mise à jour sur les projets de parcs à Stittsville (septembre 2026)</h2>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>Plusieurs nouveaux parcs sont en travaux de construction et plusieurs autres parcs plus anciens font l’objet de réaménagements à Stittsville. Voici les dernières informations sur chaque projet en date de septembre 2026.</p>
<p>&nbsp;</p>
<p><strong>Nouveaux parcs</strong></p>
<p><a href="https://glengower.ca/tag/fernbank-district-park/"><strong>Parc de district Fernbank</strong></a><strong> (Abbott/Lift/Clintonia/Rouncey)<br />
</strong><a href="https://glengower.ca/information/fernbank-district-park-consultation-begins/">Les plans conceptuels sont maintenant disponibles</a> et le personnel de la Ville continue de recueillir les commentaires. Notre bureau tiendra <a href="https://glengower.ca/tag/fernbank-district-park/">une consultation éclair</a> pour le nouveau parc de district Fernbank le samedi 3 octobre 2026.</p>
<p><a href="https://glengower.ca/development/cope-park-fernbank-community-park-3-concept-design/"><strong>Parc Brummell-Curry (Cope à la hauteur de Dagenham, dans Westwood)</strong></a><br />
Auparavant désigné parc Cope. Les travaux ont commencé et devraient être achevés en 2027.</p>
<p><a href="https://glengower.ca/development/dagenham-park-concept-design-westwood/"><strong>Parc Dagenham (Dagenham à la hauteur de David Wiens, dans Westwood)</strong></a><br />
Auparavant désigné parc David Wiens. Les travaux devraient débuter sous peu et s’achever en 2027.</p>
<p><a href="https://glengower.ca/information/new-granary-grove-park-concept-plans/"><strong>Parc Granary Grove (Granary et Craig Duncan, dans Shea Village)</strong></a><br />
Cavanagh prévoit commencer la construction du parc à l’automne 2026, pour un achèvement à l’été 2027.</p>
<p><a href="https://glengower.ca/development/update-construction-is-starting-on-the-idylea-linear-park-and-pathway/"><strong>Parc linéaire Idylea (côté ouest du quartier Idylea)</strong></a><br />
Il s’agit d’un lien de sentier nord-sud qui relie le chemin Fernbank à la zone boisée de Kemp, et qui passe également à l’arrière des habitations sur Caribou et Liard. Les travaux sont en cours et seront parachevés lors des prochaines phases du quartier Idylea.</p>
<p><a href="https://glengower.ca/information/update-shea-woods-dog-park/"><strong>Shea Woods – futur parc à chiens sans laisse</strong></a><br />
En 2022, le Conseil municipal a approuvé une entente visant l’acquisition et la protection d’environ cinq hectares du boisé du chemin Shea, afin de préserver la forêt dans le cadre d’un parc public. Cette acquisition est maintenant conclue, et le terrain appartient à la Ville d’Ottawa. Au cours de la prochaine année environ, la Ville entreprendra des activités de mobilisation pour finaliser les plans du parc.</p>
<p>&nbsp;</p>
<p><strong>Améliorations aux parcs</strong></p>
<p><a href="https://glengower.ca/notebook/notebook-more-cricket-spaces-coming-to-stittsville/"><strong>Parc Bradley-Craig – Terrain de cricket (Cranesbill)</strong></a><br />
La conception finale est en cours et l’installation est prévue en 2026.</p>
<p><a href="https://glengower.ca/information/stitt-street-park-playground-renewal-concept-designs/"><strong>Parc Stitt Street – Remplacement de la structure de jeu (rue Stitt)</strong></a><br />
La consultation publique pour ce projet a eu lieu en janvier 2026. Les travaux sont en cours pour remplacer l’ancienne structure de jeu et devraient être achevés en grande partie d’ici la fin de l’automne 2026.</p>
<p><strong>Parc Rouncey – Bandes de patinoire</strong><br />
De nouvelles bandes de patinoire sont ajoutées pour la patinoire extérieure. Travaux à achever avant l’hiver 2026.</p>
<p>&nbsp;</p>
<p>The post <a href="https://glengower.ca/development/progress-update-on-park-projects-in-stittsville-september-2026/">Progress update on park projects in Stittsville (September 2026)</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Historic Hartin buildings on Maple Grove recommended for heritage designation</title>
		<link>https://glengower.ca/development/historic-hartin-buildings-on-maple-grove-recommended-for-heritage-designation/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=historic-hartin-buildings-on-maple-grove-recommended-for-heritage-designation</link>
		
		<dc:creator><![CDATA[Team Stittsville]]></dc:creator>
		<pubDate>Tue, 15 Sep 2026 13:45:24 +0000</pubDate>
				<category><![CDATA[Development]]></category>
		<category><![CDATA[1837 maple grove]]></category>
		<category><![CDATA[fairwinds]]></category>
		<category><![CDATA[heritage]]></category>
		<guid isPermaLink="false">https://glengower.ca/?p=22721</guid>

					<description><![CDATA[<p>(Photo: Hartin House in 2012, when it was still being used as a home.) UPDATE: Built Heritage Committee approved designation of the buildings on September 15, 2026. City Council will consider the file on September 22, 2026. Originally published September 5, 2026 La version française suit The Built Heritage Committee will meet on September 15 [&#8230;]</p>
<p>The post <a href="https://glengower.ca/development/historic-hartin-buildings-on-maple-grove-recommended-for-heritage-designation/">Historic Hartin buildings on Maple Grove recommended for heritage designation</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><em>(Photo: Hartin House in 2012, when it was still being used as a home.)</em></p>
<p><strong>UPDATE:</strong> Built Heritage Committee approved designation of the buildings on September 15, 2026. City Council will consider the file on September 22, 2026.</p>
<hr />
<p><em>Originally published September 5, 2026</em></p>
<p><em>La version française suit</em></p>
<p>The Built Heritage Committee will meet on September 15 to consider designating the historic Hartin farmstead buildings in Stittsville’s Fairwinds community under Part IV of the <em>Ontario Heritage Act</em>. The two buildings—the Patrick Hartin House and a smaller &#8220;stone cottage&#8221;—are within the recently completed Mattamy development at <a href="https://glengower.ca/tag/1837-maple-grove/">1837 Maple Grove Road.</a></p>
<p>The Patrick Hartin House was built around 1886. It’s described by the City’s Heritage Planning Branch as a Gothic revival style farmhouse with rustic stone construction, cross-gable roofline, and decorative masonry and woodwork.</p>
<p>The stone cottage is a more modest building constructed 40 years earlier, around 1840. Located around the corner (now at the address of 756 Kinstead Private), the building is similarly considered typical of its style, location, and era due to its simple form, pitched gable, and construction method. It&#8217;s also notable for being one of the few buildings in the area that survived the Great Fire of 1870.</p>
<p>Both buildings remained in the Hartin family for 170 years. They are considered “stone cousins” to other local heritage buildings constructed in the 1800s—though only few survive today, such as the David Hartin house at 10 Cedarow Court.</p>
<p>City staff recommend designating these buildings due to their design value, historic value, and contextual value to the community. Both the Patrick Hartin House and the stone cottage were previously listed on the City’s Heritage Register. Designation would protect these generations-old buildings for future residents of Stittsville.</p>
<p>Here are Councillor Glen&#8217;s comments to the staff report:</p>
<blockquote><p>I’m glad to see staff’s recommendation to designate the Hartin house and cottage under<br />
Part IV of the Ontario Heritage Act. This is one of only a few stone buildings remaining<br />
in Stittsville from the late 19th century, including nearby Boyd House, Patrick Hartin<br />
House (JASK Salon + Day Spa), and Kemp Tavern (Cabotto’s Restaurant). The cottage<br />
is notable as one of the very few west end buildings that pre-date the Great Fire of<br />
1870.<br />
I also want to recognize the care and diligence that the new owners have put into<br />
renovations of the main building over the past year, as they are preparing to open the<br />
Stonehouse Café &amp; Lounge. The restored building will be a special and unique part of<br />
the Fairwinds community for decades to come, and a lasting link to the rural and<br />
agricultural heritage of Huntley and Goulbourn townships.</p></blockquote>
<hr />
<h2>Désignation patrimoniale recommandée pour les bâtiments historiques Hartin du chemin Maple Grove</h2>
<p>(Photo : La maison Hartin en 2012, alors qu’elle servait encore de résidence.)</p>
<p>Le Comité du patrimoine bâti se réunira le 15 septembre afin d’étudier la désignation des bâtiments historiques de la ferme Hartin, situés dans le secteur Fairwinds à Stittsville, en vertu de la partie IV de la <em>Loi sur le patrimoine de l’Ontario</em>. Les deux bâtiments, soit la maison Patrick Hartin et un « cottage de pierre » plus modeste, se trouvent sur le terrain du récent projet d’aménagement de Mattamy au <a href="https://glengower.ca/tag/1837-maple-grove/">1837, chemin Maple Grove</a> (en anglais seulement).</p>
<p>La maison Patrick Hartin remonte à la fin du 19<sup>e</sup> siècle. La Direction de la planification du patrimoine de la Ville la décrit comme une maison de ferme de style néogothique en maçonnerie de pierre rustique, dotée d’un toit à pignons croisés ainsi que de maçonnerie et de boiseries décoratives.</p>
<p>Le cottage de pierre est un bâtiment plus modeste construit 40 ans plus tôt, vers 1840. Situé au coin de la rue (maintenant au 756, place Kinstead), ce bâtiment est également considéré comme représentatif de son style, de son emplacement et de son époque en raison de sa forme simple, de son toit à pignon en pente et de son mode de construction. Il se distingue aussi par le fait qu’il s’agit de l’un des rares bâtiments de la région à avoir survécu au grand incendie de 1870.</p>
<p>Les deux bâtiments sont restés au sein de la famille Hartin pendant 170 ans. Ils sont considérés comme des « cousins de pierre » d’autres bâtiments patrimoniaux locaux construits au 19<sup>e</sup> siècle, bien que très peu subsistent aujourd’hui, comme la maison David Hartin au 10, cour Cedarow.</p>
<p>Le personnel de la Ville recommande de désigner ces bâtiments en raison de leur valeur sur le plan de la conception, historique et contextuelle pour la communauté. La maison Patrick Hartin et le cottage de pierre étaient toutes deux déjà inscrites au Registre du patrimoine de la Ville. La désignation permettrait de protéger ces bâtiments centenaires pour les futurs résidents de Stittsville.</p>
<p>Voici les commentaires du conseiller Glen concernant le rapport du personnel :</p>
<blockquote><p>Je suis heureux de constater que le personnel recommande de désigner la maison et le cottage de pierre Hartin en vertu de la partie IV de la <em>Loi sur le patrimoine de l’Ontario</em>. Il s’agit de l’un des rares bâtiments en pierre datant de la fin du 19<sup>e</sup> siècle qui subsistent à Stittsville, avec la maison Boyd située à proximité, la maison Patrick Hartin (JASK Salon + Day Spa) et la Kemp’s Tavern (restaurant Cabotto’s). Le cottage de pierre<br />
se démarque comme l’un des très rares bâtiments de l’ouest de la ville qui ont survécu au grand incendie de<br />
1870.<br />
Je tiens également à souligner le soin et la diligence dont les nouveaux propriétaires ont fait preuve dans<br />
les travaux de rénovation du bâtiment principal au cours de la dernière année, alors qu’ils se préparent à ouvrir le Stonehouse Café &amp; Lounge. Ce bâtiment restauré sera un élément spécial et unique de la communauté de Fairwinds pour les décennies à venir, ainsi qu’un lien durable avec le patrimoine rural et<br />
agricole des cantons de Huntley et de Goulbourn.</p></blockquote>
<hr />
<p>&nbsp;</p>
<p><em>Images from the staff report recommending heritage designation.</em></p>
<p><a href="https://glengower.ca/development/historic-hartin-buildings-on-maple-grove-recommended-for-heritage-designation/attachment/hartin-house-stone-cottage-1972/" rel="attachment wp-att-22827"><img loading="lazy" decoding="async" class="aligncenter size-full wp-image-22827" src="https://glengower.ca/wp-content/uploads/2026/09/hartin-house-stone-cottage-1972-scaled.jpg" alt="Black-and-white photograph of the Hartin homestead at 756 Kinstead Private, a one-and-a-half-storey stone farmhouse with a metal roof and two chimneys. A person stands near the central doorway on the grass in front of the building. The image dates from approximately 1972." width="1920" height="2366" srcset="https://glengower.ca/wp-content/uploads/2026/09/hartin-house-stone-cottage-1972-scaled.jpg 1920w, https://glengower.ca/wp-content/uploads/2026/09/hartin-house-stone-cottage-1972-1280x1578.jpg 1280w, https://glengower.ca/wp-content/uploads/2026/09/hartin-house-stone-cottage-1972-980x1208.jpg 980w, https://glengower.ca/wp-content/uploads/2026/09/hartin-house-stone-cottage-1972-480x592.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1920px, 100vw" /></a> <a href="https://glengower.ca/development/historic-hartin-buildings-on-maple-grove-recommended-for-heritage-designation/attachment/hartin-house-stone-cottage-detail/" rel="attachment wp-att-22828"><img loading="lazy" decoding="async" class="aligncenter size-full wp-image-22828" src="https://glengower.ca/wp-content/uploads/2026/09/hartin-house-stone-cottage-detail.jpg" alt="Two colour photographs of the Hartin homestead at 756 Kinstead Private. The left image shows the south-facing stone façade with a weathered metal roof, chimneys, and protective fencing around the building. The right image is a close-up view of the north stone wall, showing boarded window openings, masonry details, and nearby modern residential buildings in the background." width="1920" height="1446" srcset="https://glengower.ca/wp-content/uploads/2026/09/hartin-house-stone-cottage-detail.jpg 1920w, https://glengower.ca/wp-content/uploads/2026/09/hartin-house-stone-cottage-detail-1280x964.jpg 1280w, https://glengower.ca/wp-content/uploads/2026/09/hartin-house-stone-cottage-detail-980x738.jpg 980w, https://glengower.ca/wp-content/uploads/2026/09/hartin-house-stone-cottage-detail-480x362.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1920px, 100vw" /></a></p>
<hr />
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><em>Photos taken in 2012 by Glen Gower.<br />
Photos prises en 2012 par Glen Gower.</em></p>
<p><a href="https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00006.jpg"><img loading="lazy" decoding="async" class="aligncenter size-full wp-image-22756" src="https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00006.jpg" alt="Mailbox at Hartin House at 1837 Maple Grove. Photo by Glen Gower from 2012." width="800" height="597" srcset="https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00006.jpg 800w, https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00006-480x358.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 800px, 100vw" /></a></p>
<p><a href="https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00005.jpg"><img loading="lazy" decoding="async" class="aligncenter size-full wp-image-22755" src="https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00005.jpg" alt="Hartin House at 1837 Maple Grove. Photo by Glen Gower from 2012." width="800" height="600" srcset="https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00005.jpg 800w, https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00005-480x360.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 800px, 100vw" /></a></p>
<p><a href="https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00003.jpg"><img loading="lazy" decoding="async" class="aligncenter size-full wp-image-22754" src="https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00003.jpg" alt="Hartin House at 1837 Maple Grove. Photo by Glen Gower from 2012." width="800" height="600" srcset="https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00003.jpg 800w, https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00003-480x360.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 800px, 100vw" /></a></p>
<p><a href="https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00004.jpg"><img loading="lazy" decoding="async" class="aligncenter size-full wp-image-22753" src="https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00004.jpg" alt="Hartin cottage at 1837 Maple Grove. Photo by Glen Gower from 2012." width="800" height="600" srcset="https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00004.jpg 800w, https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00004-480x360.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 800px, 100vw" /></a></p>
<p><a href="https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00002.jpg"><img loading="lazy" decoding="async" class="aligncenter size-full wp-image-22752" src="https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00002.jpg" alt="Hartin House at 1837 Maple Grove. Photo by Glen Gower from 2012." width="800" height="593" srcset="https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00002.jpg 800w, https://glengower.ca/wp-content/uploads/2026/09/1837-maple-Grove-Road-2012-00002-480x356.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 800px, 100vw" /></a></p>
<p>The post <a href="https://glengower.ca/development/historic-hartin-buildings-on-maple-grove-recommended-for-heritage-designation/">Historic Hartin buildings on Maple Grove recommended for heritage designation</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>NOTEBOOK: Why growth keeps coming even when the roads aren’t ready</title>
		<link>https://glengower.ca/notebook/notebook-why-growth-keeps-coming-even-when-the-roads-arent-ready/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=notebook-why-growth-keeps-coming-even-when-the-roads-arent-ready</link>
		
		<dc:creator><![CDATA[Glen Gower]]></dc:creator>
		<pubDate>Tue, 15 Sep 2026 00:15:18 +0000</pubDate>
				<category><![CDATA[Development]]></category>
		<category><![CDATA[Notebook]]></category>
		<category><![CDATA[development charges]]></category>
		<category><![CDATA[mobility]]></category>
		<category><![CDATA[traffic]]></category>
		<category><![CDATA[transit]]></category>
		<category><![CDATA[transportation]]></category>
		<guid isPermaLink="false">https://glengower.ca/?p=22823</guid>

					<description><![CDATA[<p>(Photo: This is the north end of Stittsville Main Street today. The next major transportation link for Stittsville will likely be a northern extension to connect from Jackson Trails to the Connections neighbourhood.) La version française suit Can City Council pause housing development in Stittsville until Carp Road gets widened, or until LRT construction is [&#8230;]</p>
<p>The post <a href="https://glengower.ca/notebook/notebook-why-growth-keeps-coming-even-when-the-roads-arent-ready/">NOTEBOOK: Why growth keeps coming even when the roads aren’t ready</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><em>(Photo: This is the north end of Stittsville Main Street today. The next major transportation link for Stittsville will likely be a northern extension to connect from Jackson Trails to the Connections neighbourhood.)</em></p>
<p><em>La version française suit</em></p>
<p>Can City Council pause housing development in Stittsville until Carp Road gets widened, or until LRT construction is finished?</p>
<p>That’s a question I get a lot from residents, and it sounds like a straightforward and logical idea. But under Provincial legislation, the answer is simply <strong>“no.”</strong></p>
<p>We can stop a residential development if it doesn’t have water and sewer capacity, or if there’s no hydro hook-up. But as long as there is <em>some</em> road access, construction can proceed. (We can’t stop development because of a lack of schools or family doctors either.)</p>
<p>It’s hugely frustrating for residents. Our suburbs are growing fast right now. But the new transit projects and road upgrades planned to support this growth may not arrive for years.</p>
<p>This is frustrating for City Councillors too. In fact, last year City Council directed staff to <em>“</em><em>review and report on the feasibility of establishing transportation infrastructure conditions that must be satisfied before subdivision or high-density development applications can be approved in suburban expansion area lands”</em>. In other words: can we hold off development until roads and transit are ready for it?</p>
<p>We got a response from the City’s transportation planning department last month. It acknowledges that rapid growth—especially in suburban areas—puts increasing pressure on the transportation system. And staff acknowledge the need to invest in growth-related transportation infrastructure projects, partly with the proceeds from Development Charges. But in terms of delaying development to allow transportation infrastructure to catch up, the answer is clear. The City does not have the legislative authority to do this. <em>(<a href="https://glengower.ca/?attachment_id=22825">You can read the entire memo here.</a>)</em></p>
<p>The City can (and does) require developers to build “local services,” meaning transportation infrastructure to service a specific site. These include residential roads and sidewalks that are internal to the neighbourhood, plus traffic signals, roundabouts, and intersections where the local roads meet major collectors and arterials.</p>
<p>But we can’t require them to pay for a major upgrade to Carp Road, for example. That’s the City of Ottawa’s responsibility.</p>
<p>We also can’t make a development conditional on transit service. In our new Official Plan, we tried to add policy to require transit service in new neighbourhoods, but the Province overruled us.</p>
<p>Unfortunately, this technical answer isn’t very satisfying. The current system is not fair to residents who wait for years for new infrastructure while watching local roads get more congested and more dangerous.</p>
<h3>So what can we do?</h3>
<p>One thing we can do is work with developers to address community traffic and infrastructure concerns. For example, I worked with Lépine and they agreed to <a href="https://glengower.ca/notebook/notebook-motion-delays-construction-at-5000-robert-grant/">delay construction of part of the development at 5000 Robert Grant Avenue</a> until Robert Grant Avenue is built to at least Maple Grove Road.</p>
<p>Sometimes developers will voluntarily choose to build major road projects ahead of the City’s schedule, when they need them for access to the neighbourhood. A good example is the <a href="https://glengower.ca/notebook/notebook-council-gives-go-ahead-for-next-section-of-robert-grant-avenue/">Robert Grant Avenue extension from Abbott to Hazeldean</a>. Developers advanced the construction to give better access to Minto&#8217;s Abbott’s Run neighbourhood and will be reimbursed later by the City.</p>
<p>We can also request developer-funded “early service agreements” to bring transit sooner to a neighbourhood. This kind of agreement was in place in the <a href="https://stittsvillecentral.ca/next-bus-for-blackstone-arrives-in-june/">early stages of the Blackstone neighbourhood</a>. Again, it was voluntary for the developer. Meanwhile, staff are changing City policies so that we can get roundabouts or traffic signals installed earlier at major intersections. Instead of waiting for several years until there’s enough traffic to “warrant” traffic lights, the intent is to get these built at the very start of a subdivision project, before people move in.</p>
<p>There’s a great example of this at Fernbank and Edenwylde in Stittsville. The intersection didn’t technically qualify for traffic lights under the old policy, and so residents have been living with a dangerous pedestrian crossing for several years now. Traffic lights will <a href="https://glengower.ca/information/traffic-safety-measures-planned-for-stittsville-in-2026-2027/">finally be installed next year</a>. Under the new policy, however, those traffic lights would likely have been installed at the start of construction.</p>
<p>Same thing for stop signs and pedestrian crossings. The old policy only allowed for installation once there was enough traffic and people in the neighbourhood. The new policy would require them built from the get-go. That will improve safety, and should be less expensive too.</p>
<p>City staff are also making changes to financing. Council recently approved an “Agile Capital Budgeting Pilot for Road Growth Projects” to remove bottlenecks and get more projects started. Staff are also starting design and property acquisition sooner. All of these changes would likely have helped get shovels in the ground <a href="https://glengower.ca/tag/carp-road/">sooner for the Carp Road upgrade</a>.</p>
<h3>The funding conundrum</h3>
<p>The biggest figurative roadblock to getting roads and transit built faster is funding. Most major projects are funded through Development Charges, which can take a long time to accumulate before a project can start. We could borrow money to beef up our roads budget, but municipalities operate under strict limits to how much we can borrow. Plus, the cost of interest gets passed onto your property tax bill—and that is significant when the debt is in the hundreds of millions of dollars.</p>
<p>I’m cautiously optimistic that we may be on the cusp of a new municipal-provincial-federal funding arrangement for infrastructure. The <a href="https://pub-ottawa.escribemeetings.com/Meeting.aspx?Id=ba9d583c-b16d-4f97-9e87-a7b16b5825f4&amp;Agenda=Agenda&amp;lang=English&amp;Item=70&amp;Tab=attachments">Development Charge Reduction Program</a> includes replacing DC’s on new homes with a direct transfer of up-front funds to municipalities. If that becomes a permanent program and funding source, it could help cities advance more of their transportation projects in a faster timeframe. We’ll see.</p>
<p>So in the near term, growth is likely to continue outpacing infrastructure. But if the City and Province can accelerate road and transit projects through policy changes and better financing arrangements, the gap will start to shrink—not by slowing development, but by building infrastructure faster.</p>
<h2>Map of planned transportation infrastructure in Stittsville</h2>
<div id="attachment_22818" style="width: 1934px" class="wp-caption alignnone"><a href="https://glengower.ca/notebook/notebook-map-of-future-transportation-projects-in-stittsville/"><img loading="lazy" decoding="async" aria-describedby="caption-attachment-22818" class="wp-image-22818 size-full" src="https://glengower.ca/wp-content/uploads/2026/04/Ward_6_TMP_ProjectsRevSept2026.jpg" alt="Map showing future transportation projects in Stittsville. Details and description are provided in the text of this article." width="1924" height="1080" srcset="https://glengower.ca/wp-content/uploads/2026/04/Ward_6_TMP_ProjectsRevSept2026.jpg 1924w, https://glengower.ca/wp-content/uploads/2026/04/Ward_6_TMP_ProjectsRevSept2026-1280x718.jpg 1280w, https://glengower.ca/wp-content/uploads/2026/04/Ward_6_TMP_ProjectsRevSept2026-980x550.jpg 980w, https://glengower.ca/wp-content/uploads/2026/04/Ward_6_TMP_ProjectsRevSept2026-480x269.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1924px, 100vw" /></a><p id="caption-attachment-22818" class="wp-caption-text"><a href="https://glengower.ca/notebook/notebook-map-of-future-transportation-projects-in-stittsville/">Click here for a full size version of this map, and information about each of the projects.</a></p></div>
<p>&nbsp;</p>
<hr />
<h2>CARNET DE NOTES : Pourquoi la croissance se poursuit même lorsque les infrastructures routières ne sont pas encore prêtes</h2>
<p>Le Conseil municipal peut-il suspendre l’aménagement de logements à Stittsville jusqu’à ce que le chemin Carp soit élargi ou jusqu’à ce que la construction du TLR soit terminée?</p>
<p>C’est une question que me posent beaucoup de résidents, et cela semble être une idée simple et logique. Cependant, en vertu des lois provinciales, la réponse est tout simplement <strong>« non »</strong>.</p>
<p>Nous pouvons arrêter un projet d’aménagement résidentiel s’il y a un manque de capacité des conduites d’eau et des égouts, ou s’il n’y a pas de branchement électrique. Toutefois, tant qu’il y a un accès routier, la construction peut se poursuivre (nous ne pouvons pas non plus arrêter des projets d’aménagement en raison d’un manque d’écoles ou de médecins de famille).</p>
<p>C’est une source de grande frustration pour les résidents. Nos banlieues connaissent actuellement une forte croissance. Cependant, les nouveaux projets de transport en commun et les travaux de modernisation des routes prévus pour accompagner cette croissance pourraient ne pas voir le jour avant plusieurs années.</p>
<p>C’est également une source de grande frustation pour les conseillers municipaux. En effet, l’an dernier, le Conseil municipal a demandé au personnel de « <em>déterminer s’il est faisable d’établir des conditions liées aux infrastructures de transport pour les demandes de lotissement ou les projets d’aménagement de forte densité dans les zones d’expansion suburbaines, et de présenter un rapport à ce sujet</em> ». Autrement dit : peut-on suspendre des projets d’aménagement jusqu’à ce que les routes et les transports en commun soient prêts à les soutenir?</p>
<p>Le mois dernier, nous avons reçu une réponse des Services de planification des transports de la Ville. Ils reconnaissent que la forte croissance — en particulier dans les secteurs suburbains — exerce une pression croissante sur le système de transport. Le personnel reconnaît aussi la nécessité d’investir dans des projets d’infrastructure de transport liés à la croissance, notamment grâce aux recettes provenant des redevances d’aménagement. Toutefois, pour ce qui est de retarder les projets d’aménagement pour permettre aux infrastructures de transport de rattraper leur retard, la réponse est sans équivoque : la Ville ne dispose pas du pouvoir législatif nécessaire pour agir ainsi. <em>(</em><a href="https://glengower.ca/?attachment_id=22825"><em>Consultez la note de service intégrale ici</em></a><em>)</em></p>
<p>La Ville peut exiger (et exige effectivement) des promoteurs qu’ils mettent en place des « services locaux », c’est-à-dire des infrastructures de transport destinées à desservir un site particulier. Il s’agit notamment de routes et de trottoirs résidentiels situés dans le quartier, ainsi que de feux de signalisation, de carrefours giratoires et d’intersections où les routes locales rejoignent les routes collectrices et les artères principales.</p>
<p>Cependant, nous ne pouvons pas les obliger à financer une amélioration majeure du chemin Carp, par exemple. Cela relève de la responsabilité de la Ville d’Ottawa.</p>
<p>Nous ne pouvons pas non plus subordonner un projet d’aménagement à un service de transport en commun. Dans notre nouveau Plan officiel, nous avons essayé d’ajouter une politique pour exiger un service de transport en commun dans les nouveaux quartiers, mais la Province s’y est opposée.</p>
<p>Malheureusement, cette réponse technique n’est pas très satisfaisante. Le système actuel n’est pas juste envers les résidents qui attendent des années pour de nouvelles infrastructures tout en voyant les routes locales devenir plus encombrées et plus dangereuses.</p>
<h3>Alors, que pouvons-nous faire?</h3>
<p>Une solution consiste à collaborer avec les promoteurs pour donner suite aux préoccupations de la communauté concernant la circulation et les infrastructures. Par exemple, j’ai travaillé avec l’entreprise Lépine, qui a accepté de <a href="https://glengower.ca/notebook/notebook-motion-delays-construction-at-5000-robert-grant/">retarder la construction d’une partie du projet d’aménagement situé au 5000, avenue Robert Grant</a> jusqu’à ce que l’avenue Robert Grant soit aménagée au moins jusqu’au chemin Maple Grove.</p>
<p>Il arrive que des promoteurs choisissent volontairement de réaliser d’importants projets routiers avant l’échéance prévue par la Ville, lorsqu’ils en ont besoin pour assurer l’accès au quartier. Le <a href="https://glengower.ca/notebook/notebook-council-gives-go-ahead-for-next-section-of-robert-grant-avenue/">prolongement de l’avenue Robert Grant, entre la rue Abbott et le chemin Hazeldean</a> en est un bel exemple : les promoteurs ont devancé les travaux pour améliorer l’accès au quartier Abbott’s Run de Minto et seront remboursés ultérieurement par la Ville.</p>
<p>Nous pouvons également demander des « ententes de service précoce » financées par les promoteurs afin d’offrir des services de transport en commun plus tôt dans un quartier. Ce type d’entente a été mis en œuvre aux <a href="https://stittsvillecentral.ca/next-bus-for-blackstone-arrives-in-june/">premiers stades de l’aménagement du quartier Blackstone</a>. Là encore, la démarche était volontaire de la part du promoteur. Parallèlement, le personnel municipal modifie les politiques de la Ville pour permettre l’installation plus rapide de carrefours giratoires ou de feux de circulation aux principales intersections. Au lieu d’attendre plusieurs années que le volume de circulation « justifie » l’installation de feux, l’objectif est de les mettre en place dès le début du projet d’aménagement, avant l’arrivée des résidents.</p>
<p>L’intersection de Fernbank et d’Edenwylde, à Stittsville, en est un excellent exemple. Selon l’ancienne politique, cette intersection ne répondait pas techniquement aux critères requis pour l’installation de feux de circulation; les résidents doivent donc composer avec un passage pour piétons dangereux depuis plusieurs années. Des feux seront <a href="https://glengower.ca/information/traffic-safety-measures-planned-for-stittsville-in-2026-2027/">finalement installés l’an prochain</a>. Toutefois, en vertu de la nouvelle politique, ces feux auraient probablement été installés dès le début des travaux.</p>
<p>Il en va de même pour les panneaux « Arrêt » et les passages pour piétons. L’ancienne politique ne prévoyait leur installation que lorsqu’un certain niveau de circulation et de fréquentation dans le quartier était atteint. La nouvelle politique impose leur mise en place dès le départ. Cela améliorera la sécurité et devrait également s’avérer moins coûteux.</p>
<p>Le personnel de la Ville modifie aussi les modalités de financement. Le Conseil a récemment approuvé un projet pilote de budgétisation agile des immobilisations pour les projets d’expansion du réseau routier afin de lever les obstacles et de lancer davantage de projets. Le personnel entame également plus tôt les phases de conception et d’acquisition de terrains. Toutes ces mesures auraient probablement permis de démarrer <a href="https://glengower.ca/tag/carp-road/">plus rapidement les travaux de modernisation du chemin Carp</a>.</p>
<h3>Le casse-tête du financement</h3>
<p>Le plus grand obstacle figuré à l’accélération de la construction des routes et des réseaux de transport en commun est le financement. La plupart des grands projets sont financés par les redevances d’aménagement, qui peuvent prendre beaucoup de temps à s’accumuler avant qu’un projet ne puisse commencer. Nous pourrions emprunter de l’argent pour renforcer notre budget consacré aux routes, mais les municipalités sont soumises à des limites strictes quant au montant qu’elles peuvent emprunter. De plus, le coût des intérêts est répercuté sur votre facture d’imposition foncière, ce qui représente un montant considérable lorsque la dette s’élève à plusieurs centaines de millions de dollars.</p>
<p>Je suis modérément optimiste et j’ai bon espoir que nous serons peut-être à la veille d’un nouvel accord de financement municipal/provincial/fédéral pour l’infrastructure. Le <a href="https://pub-ottawa.escribemeetings.com/Meeting.aspx?Id=ba9d583c-b16d-4f97-9e87-a7b16b5825f4&amp;Agenda=Agenda&amp;lang=French&amp;Item=70&amp;Tab=attachments">Programme de réduction des redevances d’aménagement</a> prévoit le remplacement des redevances d’aménagement pour les nouvelles maisons par un transfert direct de fonds initiaux aux municipalités. Si ce programme et cette source de financement devaient devenir permanents, cela pourrait aider les villes à mener à bien davantage de leurs projets de transport dans des délais plus courts. L’avenir nous le dira.</p>
<p>À court terme, la croissance devrait donc continuer de devancer le développement des infrastructures. Toutefois, si la Ville et la Province parviennent à accélérer les projets routiers et de transport en commun grâce à des changements de politique et de meilleurs mécanismes de financement, l’écart commencera à se réduire — non pas en ralentissant les projets d’aménagement, mais en construisant les infrastructures plus rapidement.</p>
<h3>Carte des infrastructures de transport prévues à Stittsville</h3>
<p><a href="https://glengower.ca/notebook/notebook-map-of-future-transportation-projects-in-stittsville/">Cliquez ici pour consulter la version grand format de cette carte et obtenir de l’information sur chacun des projets.</a></p>
<p>&nbsp;</p>
<p>The post <a href="https://glengower.ca/notebook/notebook-why-growth-keeps-coming-even-when-the-roads-arent-ready/">NOTEBOOK: Why growth keeps coming even when the roads aren’t ready</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>2775 &#038; 2785 Palladium: Zoning By-law Amendment and Site Plan control (UPDATE)</title>
		<link>https://glengower.ca/development/2775-2785-palladium-zoning-by-law-amendment-and-site-plan-control-update/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=2775-2785-palladium-zoning-by-law-amendment-and-site-plan-control-update</link>
		
		<dc:creator><![CDATA[Team Stittsville]]></dc:creator>
		<pubDate>Thu, 10 Sep 2026 00:38:38 +0000</pubDate>
				<category><![CDATA[Development]]></category>
		<category><![CDATA[2775 and 2785 Palladium Drive]]></category>
		<category><![CDATA[connections]]></category>
		<guid isPermaLink="false">https://glengower.ca/?p=22656</guid>

					<description><![CDATA[<p>UPDATE: City Council approved the zoning bylaw amendment for this development on September 9. The site plan control application is still under review. UPDATE: The Planning and Housing Committee approved the zoning bylaw amendment for this development on September 2. La version française suit Originally published August 29, 2026 City staff are recommending approval of [&#8230;]</p>
<p>The post <a href="https://glengower.ca/development/2775-2785-palladium-zoning-by-law-amendment-and-site-plan-control-update/">2775 &#038; 2785 Palladium: Zoning By-law Amendment and Site Plan control (UPDATE)</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>UPDATE:</strong> City Council approved the zoning bylaw amendment for this development on September 9. The site plan control application is still under review.</p>
<p><strong>UPDATE:</strong> The Planning and Housing Committee approved the zoning bylaw amendment for this development on September 2.</p>
<p><em>La version française suit</em></p>
<p><em>Originally published August 29, 2026</em></p>
<p>City staff are recommending <strong>approval</strong> of a zoning by-law amendment to permit an indoor water park, family entertainment centre, 236-room hotel, and restaurant along Palladium Drive.</p>
<p>The project will come to Planning &amp; Housing Committee on Wednesday, September 2, with a final decision coming the following week at City Council.</p>
<h3>Councillor Glen&#8217;s comments from the staff report</h3>
<blockquote>
<div>I&#8217;ve heard a lot of excitement about this project from residents. This facility would generate jobs, along with tourism and economic benefits for the west end.</div>
<div></div>
<div>At the same time, there will be impacts to the nearby Connections neighbourhood, particularly from the additional traffic generated by visitors to the hotel and water park. Through the site plan process, staff must review the following:</div>
<ul data-editing-info="{&quot;applyListStyleFromLevel&quot;:false,&quot;unorderedStyleType&quot;:2}">
<li>
<div role="presentation">Can a right-in/right-out entrance be added to Palladium Drive, to reduce the amount of traffic accessing the site via Derreen/Culdaff.</div>
</li>
<li>
<div role="presentation">Capacity and design of the Derreen-Culdaff intersection. The facility will generate significantly more traffic than what was originally anticipated for Culdaff. I would like to see a traffic light or roundabout at this intersection, instead of a four-way stop.</div>
</li>
<li>
<div role="presentation">Future transit access. Ensure safe pedestrian access to all current and future bus stops on Palladium, Derreen, and Robert Grant.</div>
</li>
<li>
<div role="presentation">North-south access over the Queensway &#8211; install continuous sidewalk and bicycle infrastructure on both sides of the road over Palladium Drive, between Robert Grant and Campeau.</div>
</li>
</ul>
<p>&nbsp;</p></blockquote>
<h3>Related links</h3>
<ul>
<li>Staff report: <a href="https://pub-ottawa.escribemeetings.com/Meeting.aspx?Id=7f9c6472-aacb-43f2-b47e-7a4aec7b35ee&amp;Agenda=Agenda&amp;lang=English">Zoning By-law Amendment &#8211; 2775 and 2785 Palladium Drive and 350 Culdaff Road</a></li>
<li class="entry-title">Overview: <a href="https://glengower.ca/development/2775-2785-palladium-zoning-by-law-amendment-and-site-plan-control/">2775 &amp; 2785 Palladium: Zoning By-law Amendment and Site Plan control</a></li>
</ul>
<h3>Share your feedback</h3>
<p>There are several ways that residents can provide comments to the committee for the September 2, 2026 meeting:</p>
<ol>
<li><strong>Submit comments in writing:</strong><br />
To submit comments in writing, email the Committee Coordinator (<a href="mailto:Kelly.Crozier@ottawa.ca">Kelly.Crozier@ottawa.ca</a>). Comments received by 4:00 p.m. on Tuesday, September 1, 2026 will be provided to Members of Committee and Council prior to the meeting. Comments received after this time will be forwarded to Members of Committee and Council as soon as possible, and prior to Council’s final consideration of the item on July 15, 2026 but may not be received by Committee members prior to the July 8, 2026 meeting.</li>
<li><strong>Submit verbal comments in advance of the meeting:<br />
</strong>Call the Committee Coordinator by 4:00 p.m. on Tuesday, September 1, 2026 to have comments transcribed (613-580-2424, x16875).</li>
<li><strong>Register to speak at the committee meeting*:</strong><br />
<strong>i. Register by phone by 4:00 p.m. on Tuesday, September 1, 2026:<br />
</strong>You may contact the Committee Coordinator at 613-580-2424, x16875.<br />
<strong>ii. Register by e-mail – prior to 8:30 a.m. on Wednesday, September 2, 2026:</strong><br />
You may contact the Committee Coordinator at <a href="mailto:Kelly.Crozier@ottawa.ca">Kelly.Crozier@ottawa.ca</a><br />
*Visual presentations must be submitted by 4:00 p.m. on Tuesday, September 1, 2026.</li>
</ol>
<p>You can also contact <a href="mailto:glen.gower@ottawa.ca">Councillor Glen</a> with your questions or concerns.</p>
<hr />
<h2>2775 et 2785, promenade Palladium : modification du Règlement de zonage et réglementation du plan d’implantation (MISE À JOUR)</h2>
<p>&nbsp;</p>
<p>Le personnel de la Ville recommande l’<strong>approbation</strong> d’une modification du Règlement de zonage afin de permettre l’aménagement d’un parc aquatique intérieur, d’un centre de divertissement familial, d’un hôtel de 236 chambres et d’un restaurant le long de la promenade Palladium.</p>
<p>Le projet sera présenté au Comité de la planification et du logement le mercredi 2 septembre, et une décision finale sera prise la semaine suivante par le Conseil municipal.</p>
<p><strong>Commentaires du conseiller Glen tirés du rapport du personnel</strong></p>
<blockquote><p>J’ai constaté beaucoup d’enthousiasme de la part des résidents et résidentes à l’égard de ce projet. Cette installation générerait des emplois, tout en apportant des retombées touristiques et économiques dans l’ouest de la ville.</p>
<p>Parallèlement, il y aura des répercussions sur le quartier Connections, situé à proximité, en raison notamment de l’augmentation de la circulation générée par les visiteurs de l’hôtel et du parc aquatique. Dans le cadre du processus d’approbation du plan d’implantation, le personnel doit examiner les éléments suivants :</p>
<ul>
<li>Possibilité d’ajouter une entrée à droite et une sortie à droite sur la promenade Palladium pour réduire la circulation accédant au site par l’avenue Derreen ou le chemin Culdaff.</li>
<li>Capacité et aménagement de l’intersection de l’avenue Derreen et du chemin Culdaff. L’installation générera beaucoup plus de circulation que ce qui était prévu à l’origine pour le chemin Culdaff. J’aimerais qu’on installe des feux de circulation ou un carrefour giratoire à cette intersection, plutôt qu’un arrêt toutes directions.</li>
<li>Accès futur au transport en commun. Assurer un accès piétonnier sécuritaire à tous les arrêts d’autobus actuels et futurs sur la promenade Palladium, l’avenue Derreen et l’avenue Robert-Grant.</li>
<li>Accès nord-sud au-dessus de la Queensway. Aménager un trottoir continu et une infrastructure cyclable des deux côtés de la voie au-dessus de la promenade Palladium, entre l’avenue Robert-Grant et la promenade Campeau.</li>
</ul>
<p>&nbsp;</p></blockquote>
<p><strong>Liens connexes</strong></p>
<ul>
<li>Rapport du personnel : <a href="https://pub-ottawa.escribemeetings.com/Meeting.aspx?Id=7f9c6472-aacb-43f2-b47e-7a4aec7b35ee&amp;Agenda=Agenda&amp;lang=French">Modification du Règlement de zonage – 2775 et 2785, promenade Palladium et 350, chemin Culdaff</a></li>
<li>Renseignements généraux : <a href="https://glengower.ca/development/2775-2785-palladium-zoning-by-law-amendment-and-site-plan-control/">2775 et 2785, promenade Palladium : modification du Règlement de zonage et réglementation du plan d’implantation</a></li>
</ul>
<p><strong>Faites part de vos commentaires</strong></p>
<p>Les résidents et les résidentes peuvent transmettre leurs commentaires au comité pour la réunion du 2 septembre 2026 de plusieurs façons :</p>
<ol>
<li><strong>Soumettre des commentaires par écrit :</strong><br />
Pour soumettre des commentaires par écrit, veuillez envoyer un courriel à la coordonnatrice du comité (<a href="mailto:Kelly.Crozier@ottawa.ca">Kelly.Crozier@ottawa.ca</a>). Les commentaires reçus avant 16 h le mardi 1<sup>er </sup>septembre 2026 seront transmis aux membres du Comité et du Conseil municipal avant la réunion. Les commentaires reçus après cette heure seront transmis aux membres du Comité et du Conseil dès que possible, et avant l’examen final du point par le Conseil le 15 juillet 2026, mais pourraient ne pas être reçus par les membres du Comité avant la réunion du 8 juillet 2026.</li>
<li><strong>Soumettre des commentaires verbaux avant la réunion :<br />
</strong>Appelez la coordonnatrice du comité au plus tard le mardi 1<sup>er </sup>septembre 2026 à 16 h pour faire transcrire vos commentaires (613-580-2424, poste 16875).</li>
<li><strong>S’inscrire pour intervenir lors de la réunion du comité* :<br />
i. S’inscrire par téléphone avant 16 h le mardi 1<sup>er </sup>septembre 2026 :<br />
</strong>Vous pouvez communiquer avec la coordonnatrice du comité au 613-580-2424, poste 16875.<br />
<strong>ii. S’inscrire par courriel avant 8 h 30 le mercredi 2 septembre 2026 :</strong><br />
Vous pouvez communiquer avec la coordonnatrice du comité à <a href="mailto:Kelly.Crozier@ottawa.ca">Kelly.Crozier@ottawa.ca</a>.<br />
* Les présentations visuelles doivent être soumises au plus tard le mardi 1<sup>er </sup>septembre 2026 à 16 h.</li>
</ol>
<p>Vous pouvez également communiquer avec le <a href="mailto:glen.gower@ottawa.ca">conseiller Glen</a> pour lui faire part de vos questions ou de vos préoccupations.</p>
<p>&nbsp;</p>
<p>The post <a href="https://glengower.ca/development/2775-2785-palladium-zoning-by-law-amendment-and-site-plan-control-update/">2775 &#038; 2785 Palladium: Zoning By-law Amendment and Site Plan control (UPDATE)</a> appeared first on <a href="https://glengower.ca">Glen Gower | Councillor / Conseiller | Stittsville</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
